Mansions Phase 1-LR 981026 (4) Da;,as.F.3c WoC..q Dallas. Texas Metro (972) 263-1555
75229 Pax (.972) 24i-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-285 Date of Observation 10,'14/98 Report Date 10/26/98
To Western Rim Services
Contractor
Supplier LATTIMORE Plant 6 I Truck 939 I Ticket 6082378
Location BUILDING PAD #15 - 30' SOUTH, 15' WEST FROM NORTHEAST CORNER OF BUILDING PAD
Time Sampled 8:30 Time Batched 8:00 Weather Condition PT CLOUDY
Concrete Temperature (°F) 77 Ambient Temperature (°F) 64 Mix Number 51
Mix Description Unit Weight Water Added 15 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
124A 7 10/21 67000 2370 3000/28 DAYS
B 28 I 1/11
C 28 11/11
D H
Curing Method Test Method Standard 6" x 12" Engineer/Technician R. LOVELADY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, AET Supervisor, CMT ~1~
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation m quality (composition, appearance, performance, etc.) or any other feature of simdar subject matter prowded by
persons or conditions over which we have .no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'wowm.reports'D7429-255-98-ST October 26, ' 998