Mansions Phase 1-LR 981019 Rone Engineers. Inc. 11 ?-' Goodnlght Lane Tel. (972) 241-4517 - /nears
Dallas. For1 Wort~ Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-274 I Date of Observation 10,'02/98 Report Date 10/19/98
To Western Rim Services
Contractor
Supplier LATTIMORE Plant 7 I Truck 755 I Ticket 7059481
I
I
Location SLAB ON GRADE, BUILDING #23 - 10' WEST, 5' SOUTH FROM NORTHEAST CORNER OF BUILDING
Time Sampled 7:10 ~ Time Batched 6:31 Weather Condition CLOUDY
Concrete Temperature (OF) 79 Ambient Temperature (CF) 69 Mix Number 51
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4 1/2
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
121A 7 10/09 85000 3010 3000/28 DAYS
B 28 10/30
C 28 10/30
D H
I
Curing Method I Test Method Standard 6" x 12" Engineer/Technician R. LOVELADY
ASTM C 31 I ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, AET f~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the spec,rio samples provided 'or t. estmg. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of s~mdar sublect matter provided by
persons or conditions over whic,~ 'we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'wpwin..reports'.D7429-274-98'ST Oc'.ooer 19. 1998