Mansions Phase 1-LR 981015 Rone Engineers. Inc. 112~' Goodnight Lane -r'el. i97~'. _, 241-4517 -' RoneEn_qineers
Dahas.'Fo¢. Worl, n Dallas. Texas Metro (972) 263-1555
75229 Fax ('972) 241-5174
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: Western Rim Services PROJECT: Mansions By The Lake
DATE: October 15, 1998 OUR REPORT NO.: 3137-D7429-286
FIELD DATA:
No of Concrete I Water Air Ambient
Concrete
Set Cylinders Supplier TicketJ Time Truck Time Yards of Added Slump Content Temp Temp
No Made Number Loaded Sampled Concrete (Gal) (In) (%) '~F
125 4 7059982 5:50 6:20 10 0 5 N,,'A 60 75
126 4 6082510 7:15 8:15 10 10 6 1,,"2 N/'A 66 78
LOCATION:
125 SLAB ON GRADE - BUILDING #32, 20' NORTH, 5' EAST FROM SOUTHWEST CORNER OF BUILDING
126 SLAB ON GRADE - BUILDING #32, 30' EAST, 15' NORTH FROM SOUTHEST CORNER OF BUILDING
REMARKS:
TECHNICIAN: R. Lovelady
DISTRIBUTION:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic /'"'\
(1) Mr. Doyle Damron; C. D. Construction Consulting
Mike
CMT Su p~rvisor
Rone Engineers, inc.
L!MITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter prowded by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of :he clients to 'whom the,/are addressed.
c:' wpw~n'-reports'D7429-286-98'.ST October ". 9, 1998