Loading...
Mansions Phase 1-LR 981015 Rone Engineers. Inc. 112~' Goodnight Lane -r'el. i97~'. _, 241-4517 -' RoneEn_qineers Dahas.'Fo¢. Worl, n Dallas. Texas Metro (972) 263-1555 75229 Fax ('972) 241-5174 REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: Western Rim Services PROJECT: Mansions By The Lake DATE: October 15, 1998 OUR REPORT NO.: 3137-D7429-286 FIELD DATA: No of Concrete I Water Air Ambient Concrete Set Cylinders Supplier TicketJ Time Truck Time Yards of Added Slump Content Temp Temp No Made Number Loaded Sampled Concrete (Gal) (In) (%) '~F 125 4 7059982 5:50 6:20 10 0 5 N,,'A 60 75 126 4 6082510 7:15 8:15 10 10 6 1,,"2 N/'A 66 78 LOCATION: 125 SLAB ON GRADE - BUILDING #32, 20' NORTH, 5' EAST FROM SOUTHWEST CORNER OF BUILDING 126 SLAB ON GRADE - BUILDING #32, 30' EAST, 15' NORTH FROM SOUTHEST CORNER OF BUILDING REMARKS: TECHNICIAN: R. Lovelady DISTRIBUTION: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic /'"'\ (1) Mr. Doyle Damron; C. D. Construction Consulting Mike CMT Su p~rvisor Rone Engineers, inc. L!MITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter prowded by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of :he clients to 'whom the,/are addressed. c:' wpw~n'-reports'D7429-286-98'.ST October ". 9, 1998