Mansions Phase 1-LR 981014 (2) Rone Engineers. Inc. 11 2~-* Goodnlgh! Lane Tei. (972) 241-4517
Da~,as.-Fo,i Wonp Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-275 I Date of Observation 10/O2/98 Report Date 10/14:'98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 6 I Truck 615 I Ticket 6081663
Location SLAB ON GRADE, BUILDING #23 - 25' EAST, 10' NORTH FROM SOUTHWEST CORNER OF BUILDING
Time Sampled 9:30 Time Batched 8:10 Weather Condition CLOUDY
Concrete Temperature (°F) 79 Ambient Temperature (°F) 75 Mix Number 51
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
1 22A 7 10/09 66500 2350 3000/28 DAYS
B 28 10~30
C 28 10/30
D H
Curing Method ] Test Method I Standard 6" x 12"I Engineer/Technician R. LOVELADY
ASTM C 31 ] ASTM C 39 ~LxArea 28.27 sq. in. ]
Signature: Mike Fuller, AET I'&,/Supervisor, CMT
Remarks and/or Distributionk'%_
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
{1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples prowded for testing. We assume no
responsibiiitv for variation in quality (composition, appearance, performance, etc.) or any other feature of s~mdar subject matter prowded by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:-wpwin'.reports'.D7429-275-98'.ST Oc~ooer ' 4, 1998