Mansions Phase 1-LR 981014 (5) Rone Engineers, Inc. 112-- Goodnight Lane Tel. (972) 241-4517 - RoneEn_qineers
Da~as.'Foc. Worl. r: Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-264 Date of Observation 9/29/98 Report Date 10/14/98
To Western Rim Services
Contractor
SupplierLATTIMORE IPlant14 ITruck776 ITicket 14076827
Location SLAB ON GRADE - BUILDING #24 - 30' WEST, 15' SOUTH FROM NORTHEAST CORNER OF BUILDING
Time Sampied 9:00 Time Batched 7:50 Weather Condition CLEAR
Concrete Temperature (°F) 83 Ambient Temperature (°F) 80 Mix Number 51
Mix Description Unit Weight Water Added 5 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 7 1/2
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
116A 7 10/06 59000 2090 3000/28 DAYS
B 28 10/27
C 28 10/27
D H
Curing Method I Test Method ~ Standard 6" x 12"
I
Engineer/Technician
R.
LOVELADY
ASTM C 31 I ASTM C 39
Signature: Mike Fuller, AET ilt, I Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
L'MiTATICNS: The test results presented herein were prepared based upon the specific samples 2rovided for testing. We assume no
respons~bdity for variation ~n quality (composition, appearance, performance, etc.) or any other feature of s~mdar subject matter prowded by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to ~vhom they are
acdressed.
c:'.wpwin'.reports-D-7,t29-26498'.ST October 14, 1998