Mansions Phase 1-LR 981008 J~l, one ~ncjineer$? inc. 112~4 Goodn;gh~ Lane Tel. (g72) 241-45! 7 RoneEnqineers
J
Da,las.-Fon '¢¢orth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-237 I Date of Observation 9/09/98 Report Date 10/08/98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 7 I Truck 602 Ticket 7058143
I
I
Location SLAB ON GRADE, BUILDING #21 - 30' SOUTH AND 10' EAST OFF NORTHWEST CORNER
Time Sampled 8:39 Time Batched 8:26 Weather Condition CLEAR
Concrete Temperature (°F) 88 Ambient Temperature {°F) 84 Mix Number 51
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6 1/2
Concrete Cylinder Test(s)
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
105A 7 9/16 66000 2330 3000/28 DAYS
B 28 10/07 93000 3290
C 28 10/07 92000 3250
D H
Curing Method I Test Method I Standard 6" x 12" Engineer/Technician K. MUSTAFA
ASTM C 31 I ASTM C 39(~I Area 28.27 sq. in.
Signature: Mike Fuller, AET ~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
L;MITATIONS: The test results presented heretn ,,",'ere prepared based upcn the specific sarn. p:es prowded for -.esting. We assume no
responsibility for variat:on in quahty Icamposition, appearance, performance, etc.) or any ot.qer fed[ute of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'.wp;¥in-reports'.D7429-237-98-ST October 8, 1998