Loading...
Mansions Phase 1-LR 981008 (2) Rone Engineers, Inc. 11 2~' Goodnight Lane TeL [972) 241-4517 RoneEngineers Dadas,-For: Wortr~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-238 I Date of Observation 9/09/98 Report Date 10;08/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 I Truck 757 I Ticket 7058147 Location SLAB ON GRADE, BUILDING //21 - 10' NORTH AND 30' WEST OFF SOUTHEAST CORNER Time Sampled 9:30 Time Batched 9:12 Weather Condition CLEAR Concrete Temperature (°F) 88 Ambient Temperature (°F) 88 Mix Number 51 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 106A 7 9/16 77000 2720 3000/28 DAYS B 28 10/07 105000 3710 C 28 10/07 102000 3610 D H Curing Method I TestMethod I Standard 6" x12" I Engineer/TechnicianK. Mustafa ASTM C 31 I ASTM C 39,, I Area 28.27 sq. in. Signature: Mike Fuller, AET ~,~, Supervisor, CMT Remarks and/or Distribution ~ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented here~n were prepared based dpon the speofic samples provided for '.estmg. We assume no responsibility for variation m quaht¥ {composition, appearance, performance, etc,J Or any other feature of simdar subject matter prowded ~'/ persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whorn they are addressed. c: wpwin-.reports-.D7429-238-98'ST Cctober 8, 1998