Mansions Phase 1-LR 981008 (2) Rone Engineers, Inc. 11 2~' Goodnight Lane TeL [972) 241-4517 RoneEngineers
Dadas,-For: Wortr~ Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-238 I Date of Observation 9/09/98 Report Date 10;08/98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 7 I Truck 757 I Ticket 7058147
Location SLAB ON GRADE, BUILDING //21 - 10' NORTH AND 30' WEST OFF SOUTHEAST CORNER
Time Sampled 9:30 Time Batched 9:12 Weather Condition CLEAR
Concrete Temperature (°F) 88 Ambient Temperature (°F) 88 Mix Number 51
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
Concrete Cylinder Test(s)
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
106A 7 9/16 77000 2720 3000/28 DAYS
B 28 10/07 105000 3710
C 28 10/07 102000 3610
D H
Curing Method I TestMethod I Standard 6" x12" I Engineer/TechnicianK. Mustafa
ASTM C 31 I ASTM C 39,, I Area 28.27 sq. in.
Signature: Mike Fuller, AET ~,~, Supervisor, CMT
Remarks and/or Distribution ~
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented here~n were prepared based dpon the speofic samples provided for '.estmg. We assume no
responsibility for variation m quaht¥ {composition, appearance, performance, etc,J Or any other feature of simdar subject matter prowded ~'/
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whorn they are
addressed.
c: wpwin-.reports-.D7429-238-98'ST Cctober 8, 1998