Loading...
Mansions Phase 1-LR 981007 Datlas. Foal '/Vort.~ Dallas. Texas Metro (972) 263-I 555 ~9:z 2,41-5174 75229 Fax' Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-250 I Date of Observation 9/21/98 Report Date 10/07/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 6 I Truck 805 Ticket 6080581 I Location BUILDING #17 - 15' WEST, 15' NORTH FROM SOUTHEAST CORNER OF BUILDING Time Ssmpled 9:30 Time Batched N/A Weather Condition CLEAR Concrete Temperature (°F) 82 Ambient Temperature (°F) 81 Mix Number 57 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 110A 7 9/28 64000 2260 3000/28 DAYS B 28 10/19 C 28 10/19 D H Curing Method Test Method Standard 6" x 12" Engineer/Technician R. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET Supervisor, CMT ~L Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell '. (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting L:MITATIONS: The test results presented hereto were prepared based upon the specific samples provided for testmg. We assume no responsibility fcr variation in quality ~composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c: .wowt~'reoorts'D7429-250-98tST Oc[ober 7, ~ 998