Mansions Phase 1-LR 981006 (3) Oal,as.-Fo~ Wo'~h Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-252 I Date of Observation 9/22/98 Report Date 10/06,.'98
To Western Rim Services
Contractor
Location SLAB ON GRADE, BUILDING //22 - 30' EAST, 15' NORTH FROM SOUTHWEST CORNER
Time Sampled 7:15 Time Batched 6:55 Weather Condition PT CLOUDY
Concrete Temperature (CF) 84 Ambient Temperature (°F) 77 Mix Number 51
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.} 4 1/2
Concrete Cylinder Test(s)
SpecimenI Age I Test Date l Total Load I Compressive
No. (Days) (lbs,) Strength (psi) Strength Required (psi)
111A 7 9/29 87000 3080 3000/28 DAYS
B 28 10/20
C 28 10/20
D H
Signature: Mike Fuller, AET [~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
respons~bdity for variation in quality (composition, appearance, performance, etc.t or any other feature of s~milar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
accressed.
::..wpw;n-.reports.D7429.252_98~ST Cc=ober 6, 1998