Loading...
Mansions Phase 1-LR 981003 Rone Engineers, Inc. 11' Goodnight Lane Tel. (:972) 241-4517 RoneEngineers Dallas, Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-257 Date of Observation 9/24/98 Report Date 10/03/98 To Western Rim Services Contractor Supplier LATTIMORE Plant 7 I Truck 610 I Ticket 7058947 I I Location BUILDING SLAB #30, 24' WEST AND 18' SOUTH OF NORTHEAST CORNER OF BUILDING Time Sampled 9:20 AM Time Batched 8:32 AM Weather Condition CLEAR Concrete Temperature (°F) 88 Ambient Temperature (dF) 84 Mix Number 51 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in,) 6 1/2 Concrete Cylinder Test(s) SpecimenI Age I Test Date l TOtal Load l Compressive No. (Days) (lbs.) Strength (psi) Strength Required (psi) 114A 7 10/01 83000 2940 3000/28 DAYS B 28 10/22 C 28 10/22 D H CuringMeth°d I TestMeth°d/ Standard 6" x12" I Engineer/TechnicianG'BEALLArea ASTM C 31 ASTM C 39/,~ 28.27 sq. in. Signature: Mike Fuller, AET [~J Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting =iMITATIONS: The test results presented herein were prepared based upon :he spec;ftc samples provided for testing. We assume no responsibility for variatmn in quality Icompos~tion, appearance, performance, etc.) or any other feature of s~milar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exoluswe use of the clients to whom they are addressec. c: wDw,n.reports'.D7429-257-98'.ST October 3, ! 998