Mansions Phase 1-LR 981003 (2) Rone Engineers. Inc. ~3~'-- Goodnig~t Lane TeL (972) 241-4517 - RoneEngineers
Dal~as,'Fo,'-t Wcrt. n Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-229 Date of Observation 9~02~98 Report Date 10/03/98
To Western Rim Services
Location BUILDING PAD #18 - 45' SOUTH, 10' WEST FROM NORTHEAST CORNER OF BUILDING
Contractor
Supplier LATTIMORE Plant 6 I Truck 803 Ticket 6079369
I
Time Sampled 8:45 Time Batched N/A Weather Condition CLEAR
Concrete Temperature {°F) 83 Ambient Temperature (°F) 81 Mix Number 61
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
ENTRAINED AIR (%) 4.6
Concrete Cylinder Test(s)
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
101A 7 9/09 61000 2160 3000/28 DAYS
B 28 9/30 85000 3010
C 28 9/30 88500 3130
D H
Curing Method I Test Method I Standard 6" x12" I Engineer/TechnicianR. LOVELADY
ASTM C 31 I ASTM C 39/,~, Area 28.27 sq. in.
Signature: Mike Fuller, ~F Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
L!MITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
respons~bd~ty for vanation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
~,ersons or ccnditicns over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:.wpwm'.reportstD7429-229-98',ST October 3, 1998