Mansions Phase 1-LR 981003 (6) Da~.as, Fo,1 Wod~ Dallas. Texas Metro (972) 263-155~
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-257 [ Date of Observation 9/24/98 Report Date 10/03/98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 7 I Truck 610 I Ticket 7058947
Location BUILDING SLAB #30, 24' WEST AND 1 $' SOUTH OF NORTHEAST CORNER OF BUILDING
Time Sampled 9:20 AM Time Batched 8:32 AM Weather Condition CLEAR
Concrete Temperature (°F) 88 Ambient Temperature (°F) 84 Mix Number 51
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6 1/2
Concrete Cylinder Test(s)
Specimen I Age I Test Date l TOtal Load Compressive
No. (Days) (lbs,) Strength (psi) Strength Required (psi)
114A 7 10/01 83000 2940 3000/28 DAYS
B 28 10/22 83000 2940'
C 28 1 0/22 86000 3060
D 56 11/20
Mike Fuller, AET Supervisor, CMT
Signature:
Remarks and/or Distribution
*DID NOT MEET REQUIRED STRENGTH, WILL TEST HOLD CYLINDER AT 56 DAY BREAK
Distribution: (1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein 'were prepared based upon the specific samples provided for testing. We assume qo
responsibility for variation ~n quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'.wpwin,.reports~D7429-257-98'.ST October 3, 1998