Loading...
Dry Clean & Donut-CS010709 (2) QAgH ~:LLV[O-60-£O BENTLEY ENGINEERING, INC. CIVIL ENGINEERING · PLANNING CONSTRUCTION MANAGEMENT MARC O. BENTLEY, P.E. July 9, 2001 Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell 255 Parkway Coppell, Texas 75019 Re: Dry Clean City Dear Mr. Griffin: Attached is one (1) City mark-up and two (2) revised sets of the site development plans for the referenced project. We have revised these plans in accordance with your letter dated July 5, 2001. In accordance with Item 3 of your letter, we are proposing that the on-site pavement be 6 inch thick 4000 PSI reinforced concrete pavement with #3 rebar on 18 inch centers in both directions on 6 inch compacted subgrade. This request is being made in lieu of lime stabilizing the subgrade. We would appreciate your consideration of our alternate paving section. If you should have any questions or concerns, please do not hesitate to call. Sincerely, BENTLEY ENGINEERING, INC. Marc O. Bentloy, F'.E. Attachments 702 GATEWOOD DRIVE GARLAND, TEXAS 75043 (972) 240-4821 FAX (972) 240-0922