Loading...
Connell Skaggs (7-11)-CS 900213 Coppell, ~xas 75019 (~~j~ The City With A Beautiful Future 214-462-0022 13, 1990 ~ February Mr. Mostafa Setayesh, P.E. The Dimension Group, Inc. 3455 Hi,land Road, Suite 100 Dallas, Texas 75228 RE: Mobil 0il/7-11 at Sandy Lake Road and Denton Tap Road (Connell/Skaggs Addition, Lot 4) Dear Mr. Setayesh: Attached please find a draft copy of the Escrow Agreement regarding Sandy Lake Road. As we discussed, we are in the process of reviewing said agreement, along with our City Attorney. Please note that staff has checked the final plat files on the above referenced project and attached you will also find a letter from the City to Mr. Koch with Powell &-Powell Engineers, dated June 15, 1987, requesting a fee in the amount of $1451.00. Said fee was paid in the amount of $1448.88 (see attached copy of receipt). Listed below are the fees on the above referenced project: CURRENT FEES FEES PAID (due on 2/26/90) on 6/19/87 Availability Fee $366.48 $404.00 Water Tap Fee - $100.00 Sewer Tap Fee - $100.00 Construction Inspection Fee - 1) Initial Deposit - $847.00 2) 1.5% Construction Estimate - (1.5% x $20634.90 as $309.59 you provided on 12/12/90) Street Improvement Escrow Amount $11,900.00 Subtotal $12,576.07 $1451.00 Amount Paid - $1448.88 Total Amount Due $11,127.19 Page 2 of 2 Please forward a check for the amount of $11,087.12 to the Finance Department, City of Coppell, by Monday, February 26, 1990, and send us a copy of the receipt. Please note that we will have the Escrow Agreement item on the same City Council Agenda as your S.U.P. request regarding this project. If you have any questions, please do not hesitate to call me at 462-8495. Singe,rely, ~ /~ .~s's~ell R. · Doy~P.E. RRD / SMD / bb xc: Taryon Bowman, P & Z Coordinator Larry Davis, Construction Inspector Amy Crowley, Accountant A1 Rogers, Mobil Oil Corporation Mike Irvin, Southland Corporation Attachment MOS TAFA . SMD ... June 15, 1987 Mr. Jim Koch Powell and Powell Engineers 3988 N. Central Expressway Suite #1130 Dallas, Texas 75204 RE: Connell/Skaggs, Lot 4, Final Plat Dear Mr. Koch: Listed below, please find the fees for the above referenced project, which were calculated by Mr. Gabe Favre of Ginn, Inc., and were made available to me on June 8, 1987: FEES DUE TOTAL FEES 6-18-87 S.U.P. * 615.00 - Zoning - - Preliminary Plat * 104.00 - Final Plat * 125.88 - Water Availability 808.00 404.00 Sewer Availability - - Water Tap Fees (Assume 2) 100.00 100.00 'Sewer Connection (Assume 2) 100.00 100.00 Construction Permit Fees: 1) initial deposit 847.00 847.00 2) 1.5% construction estimate to be determined - 3) actual cost to be determined - Water Load Test to be determined Street Lights (estimate 3) @ 261.00 783.00 - Street Signs to be determined - Street Assessment: ($100 estimated/Front Foot) 16,723.00 Utility Inspection Fee 150.00 - $1,451.00 * These fees have been paid The amount of $1,451.00.is due before June 18, 1987 at 2:00 p.m., prior to Final Plat approval by the City Council on June 23,'1987. Please call me at 462-0022, extension 249; or Gabe Favre at 248-4900 if you have any questions. Sincerely, Shohre Daneshmand Civil Engineer SD/lsg cc: Frank Trando, Director of Finance Gabe Favre, Ginn, Inc. Taryon Bowman,'P & Z Coordinator Steve Goram, Director of Public Works '." CONNELL/FEES PZAGN COPPELL PUBLIC WORKS MEMORANDUM DATE: December 13, 1989 ~~ TO: Shohre Daneshmand, Civil Engineer FROH: Howard Pafford, Water Utilities Superintendent RE: Water/Sewer Fees for Mobil 0il/Seven Eleven Store Below you will find I have listed all water/sewer fees associated with the above referenced retail store and at what time they will need to be paid. Water Availability 3054 sq. ft. Building @ $60.00/1000 sq. ft. Total $183.24 50% due prior to Council Approval .- $91.62 50% due at time of Building Permit Issuance $91.62 Sewer Availability 3054 sq. ft. Building @ 60.00/1000 sq. ft. Total $183.24 50% due prior to Council Approval $91.62 50% due at time of Building Permit Issuance $91.62 Water Tap Fee 1 Connection @ $100.00/each Total $100.00 100% due prior to Council Approval $100.00 Sewer Tap Fee '1 Connection @ $100.00/each Total $100.00 100% due prior to Council Approval $100.00 Additionally, you will also need to make Mr. Setayesh aware that the Utility Contractor will be responsible for the cost of the -" water meter (at $127.26) as well as the deposit for the water service (at $35.00). .... These fees will need to be paid at the City of Coppell's Finance Department at Town Center. All checks made payable to the City of Coppell and they must state what fee is being paid and the project name. If you have any questions regarding this matter,· please advise. HLP/bb xc: ~my Crowley, Accountant