Loading...
ST9302-CS010907 (2) .~- ~..~, ~._'.~~ .~. ~ ~~~ September 7, 2001 Robert We~r, Project M~ager ~ ~ . ~ o Ed Bell Cons~ction 10605 H~ Hines Blvd. P.O. Box 540787 Dall~, ~ 75354-0787 Re: Sandy Lake Road Project #ST 93-.02 Dear Mr. Weber: The City of Coppell has recently been approached by residents along Heatherglen about the possibility of the construction of a median opening at that street intersection. Attached to this letter is a schematic showing a proposed median opening. By my calculations, the median opening should contain the following components: Item Quantit}, Unit Description 1. 310 LF Concrete Curb and Gutter Removal 2. 88 CY Unclassified Street Excavation 3. 196 SY 8" Lime Subgrade 4. 3.8 TONS Lime 5. 225 SY 8" Concrete Paving 6. 195 LF Concrete Curb 7. 32 SY Pavestones 8. --- EA Necessary Buttons to delineate the left turn lane per City Details 9. - ..... Any adjustment of existing conduit or pull boxes that may conflict with the proposed opening By virtue of this letter, the City of Coppell is requesting that you provide a cost estimate for the construction of this left turn lane. Once that estimate has been provided, the City will make a determination as to whether or not to include this left turn lane in this project. Thank you for your consideration of this matter. If you should have any questions or need additional clarification please feel free to contact me at your convenience. Sincerely, /r) Kenneth M. Griffin, P.E. Director of Engineering/Public Works 2,55 PARKWAY 3IrP.O.BOX 478 "k COPPELL TX 75019 'k TE:L 972/462 0022 "k FAX 972/304 3673