Mansions Phase 1-LR 980924 (2) · nvn~ ~.n~jin~ro. ,nc. ~Z:~ oooon,g,t L ne - RoneEnaineers
Dailas?Fo~. Wortt~ Dallas. Texas Metro (972) 2~3-1555
75229 Fax ~972) 241-~174
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: Western Rim Services PROJECT: Mansions By The Lake
DATE: September 24, 1998 OUR REPORT NO.: 3137-D7429-255
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Yards of Added Slump Content Temp Temp
No Made Number Loaded Sampled Concrete (Gal) (In) (%) °F °F
_ 113 4 7058940 7:52 AM 8:40 AM 10 0 4.0 N/A 84 88
114 4 ' 7058947 8:32 AM 9:20 AM 10 0 6.5 N/A 84 88
LOCATION:
113 BUILDING SLAB #30 - 30' SOUTH AND 12' WEST OF NORTHEAST CORNER OF BUILDING
114 BUILDING SLAB 330 - 24' WEST AND 18' SOUTH OF NORTHEAST CORNER OF BUILDING
REMARKS:
TECHNICIAN: G. BEALL
DISTRIBUTION:
(1) Mr, Richard E, Simmons; Western Rim Services
(1) Mr, Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
{1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
Mike I~er
CMT Supervisor
Rone Engineers, inc.
LIMITATIONS: The test results presented herein 'were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter prowded by
persons or conditions over which we have no control. Our letters and rel3orts are for the exclusive use of the clients to whom they are addressed.
c:;wpwin',rel~orts\D7429-255-98\ST September 30, 1998