Loading...
Mansions Phase 1-LR 980917 Rone Engineers, Inc. 11 ~ 3oodni(~ht_ Lane Tel. ~_~,,aTc, 241-4517 RoneEngineers Dallas. Forl Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-237 Date of Observation 9/09/98 Report Date 09/17/98 To Western Rim Services Contractor Supplier LATTIMORE Plant 7 I Truck 602 I Ticket 7058143 Location SLAB ON GRADE, BUILDING //21 - 30' SOUTH AND 10' EAST OFF NORTHWEST CORNER Time Sampled 8:39 Time Batch 8:26 Weather Condition CLEAR Concrete Temperature (OF) 88 Ambient Temperature (°F) 84 Mix Number 51 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6 1/2 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 105A 7 9/16 66000 2330 3000/28 DAYS B 28 10/7 C 28 10/7 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:'.wpwimreports~.D7429-237-98;ST September 17, 1998