Loading...
Mansions Phase 1-LR 980917 (2) Rone Engineers. Inc. 112 Goodni_ght Lane Te,. (972) 241-4517 Rone En( ineers Oa',as Fo~ Won:n Dallas. Texas Metro (972) 263-i 555 75229 Fax ~'a72; 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-238 [ Date of Observation 9/09/98 Report Date 09i17i98 To Western Rim Services Contractor Supplier LATTIMORE J Plant 7 I Truck 757 I Ticket 7058147 Location SLAB ON GRADE, BUILDING //21 - 10' NORTH AND 30' WEST OFF SOUTHEAST CORNER Time Sampled 9:30 Time Batch 9:12 Weather Condition CLEAR Concrete Temperature (°F) 88 Ambient Temperature {OF) 88 Mix Number 51 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 106A 7 9/16 77000 2720 3000/28 DAYS B 28 10/7 C 28 10/7 D H Curing Method I Test Method / Standard 6" x12" I Engineer/TechnicianK. Mustafa ASTM C 31 ASTM C 39 h Area 28.27 sq. in. Signature: Mike Fuller, AET ~Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter prowded by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to 'whom they are addressed. c:'.wpwm',reports',D7429-238-98\ST September 17, 1998