Loading...
Mansions Phase 1-LR 980915 Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-229 I Date of Observation 9/02/98 Report Date 09/15/98 To Western Rim Services BUILDING.J~ #18 - 45' SOUTH, 10' WEST FROM NORTHEAST CORNER OF BUILDING Location Contractor Supplier LATTIMORE Plant 6 I Truck 803 Ticket 6079369 Time Sampled 8:45 Time Bitched N/A Weather Condition CLEAR Concrete Temperature (°F) 83 Ambient Temperature {°F) 81 Mix Number 61 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 ENTRAINED AIR (%) 4.6 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 101A 7 9/09 61000 2160 3000/28 DAYS B 28 9~30 C 28 9/30 D H Curing Method I Test Method I Standard6"xl2" I Engineer/TechnicianR. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E, Simmons; Western Rim Services (1) Mr, Larry Davis; City of Coppell (1) Mr, Mike Hodge; City of Coppell (1) Mr, Tony Martin; Newport Classic (1) Mr, Doyle Damron; C, D, Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:',wpwin\reports~D7429-229-98\ST September 15, 1998