Mansions Phase 1-LR 980915 Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-229 I Date of Observation 9/02/98 Report Date 09/15/98
To Western Rim Services
BUILDING.J~ #18 - 45' SOUTH, 10' WEST FROM NORTHEAST CORNER OF BUILDING
Location
Contractor
Supplier LATTIMORE Plant 6 I Truck 803 Ticket 6079369
Time Sampled 8:45 Time Bitched N/A Weather Condition CLEAR
Concrete Temperature (°F) 83 Ambient Temperature {°F) 81 Mix Number 61
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
ENTRAINED AIR (%) 4.6
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
101A 7 9/09 61000 2160 3000/28 DAYS
B 28 9~30
C 28 9/30
D H
Curing Method I Test Method I Standard6"xl2" I Engineer/TechnicianR. LOVELADY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E, Simmons; Western Rim Services
(1) Mr, Larry Davis; City of Coppell
(1) Mr, Mike Hodge; City of Coppell
(1) Mr, Tony Martin; Newport Classic
(1) Mr, Doyle Damron; C, D, Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:',wpwin\reports~D7429-229-98\ST September 15, 1998