Mansions Phase 1-LR 980915 (2) none ~.ngineers, Inc. ]7 Z~ Goodnigl~t Lane Tel. (972) 241-4517 -- ineers
Dallas..'For~ Wortt~ Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-233 I Date of Observation 9/03/98 Report Date 09/15/98
To Western Rim Services
Location BUILDING PAD//19, 5' WEST, 10' NORTH FROM SOUTHEAST CORNER OF BUILDING PAD
Contractor
Supplier LATTIMORE I Plant 6 I Truck 803 Ticket 6079498
Time Sampled 9:10 Time Batched N/A Weather Condition CLEAR
Concrete Temperature (°F) 86 Ambient Temperature {°F) 81 Mix Number 61
Mix Description Unit Weight Water Added 5 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
Concrete Cylinder Test(s)
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
103A 7 9/10 51000 1800 3000/28 DAYS
B 28 10/01
C 28 10/01
D H
I
Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician R. LOVELADY
ASTM C 31 I ASTM C 397,1 Area 28.27 sq. in.
I
Mike Fuller, ~ Supervisor, CMT
Signature:
Remarks and/or Distribution '~
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D, Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature o1" similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:',wpwin\reports\D7429-233-98\ST September 15, 1998