Loading...
Mansions Phase 1-LR 980825 Rone Engineers, Inc. 'l'12~'--~oodnight Lane Tel. (972) 241-4517 - RoneEnc ineers Dallas. Fort, Wor!.n Dallas. Texas Metro (972) 263-1555 i 75229 Fax (972) 241-5174 ELONGATION REPORT Project: IVlansions By The Lake Page 1 of 1 Report No: 3137-D7429-223 Sample Date: August 21, 1998 Client: Western Rim Services Report Date: August 25, 1998 Location: Club House Technician: T. Duke # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips~ Pressure Elongations End (.1) End (2) Elongations Tolerance 9 S46 West Side 24K 4500 5 0 5 NO 62 S23 North Side 33K SEE NOTE i S29 West Side 33K 5500 2 1;8 I 3/4 5:'16 2 1/16 YES 19 S89 South Side 33K 5500 6 7,'8 6 I/4 3/4 7 YES I Equipment ID: Ram No: 94006 Pump No: 381995 Gauge No: 94006 Equipment Calibration Date: 8/17/98 Comments: Cable #9 - Gauge pulled to 4500 PSI, no change in length. Cable #52 - at concrete, was asr 45° angle and Contractor could not attach equipment. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality. (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. ~. c:'.wpwin':reports'.D7429-223-98~.$T August 25. 1998