NORTH LAKE INDUSTRIAL PARK GRADING AND DRAINAGE
Item l-Call to Order - The meeting was called to order by Larry Davis at
2:00 p.m.
Item 2-Sign in Sheet - Everyone signed in, acknowledging their presence.
Item 3-Introduction - Each individual introduced themselves and their
respective employers.
Item 4-Larry Davis had everyone look at the plans for North Lake.
Item -Larry discusses the right of way of the land occupants.
Item 5-L.E. Delekta, Inc.-Larry De1ekta asked about the bore petition.
Item 6-Larry Davis said he would give a surprise inspection of the bore
petition at some time.
Item 7-Michae1 Garrett asked who the contractor and the subcontractor were
for the project.
Item a-Larry Davis said he was the contractor and there would be one
subcontractor, Billings.
Item 9-Larry Davis talked about the requirements.
Item 10-Larry Davis and Michael Garrett discuss the lab that will be used
for this project. They agree on
Item ll-Michae1 Garrett explains that the casing on the
will be 14 inch steal casings.