Loading...
Mansions Phase 1-LR 980625(2) RenoEngineers,Inc. 1!? GooO., h, a.e -. -- RoneEn ineers Dal;as. FO~ ',",,'Crtn Dallas. Texas Metro ;~972> 263-I 555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-184 Date of Observation 4;28,.'95 Report Date 06;25..'95 To Western Rim Services Location PAVING NEXT TO BUILDING 38, SOUTHWEST CORNER, 10' EAST 5' SOUTH Contractor Supplier LATTIMORE Plant 6 I Truck 452 Ticket 6070799 Time Sampled 11:30 Time Batched 11:20 Weather Condition CLOUDY Concrete Temperature I°F) 63 Ambient Temperature ICF) 70 Mix Number 36 Mix Description 4.50 SACKS W,'R AIR Unit Weight Water Added 15 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4 1/2 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required ~ps) 1 5A 7 5/05 60000 21 20 3000/28 DAYS B 28 5/26 70000 2480* C 28 5/26 69000 2440' D 56 6/23 85000 3010 ASTM C 31 ASTM C 39 I Area 28.27 sq. in. Signature: Mike Fuller, i~/~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting L MI-AT!ONS: The test results presented herein were prepared based upon t.~e specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.? or any other feature of simdar subject matter prowded by persons or conditions over which we have no control. Our '.etters and reports are for :he exclusive .Js8 of ;he clients to whom the,/ are addressed. c: wpw:n..reDcrts'.D7429-184-98 .ST .une 25. 1998