Mansions Phase 1-LR 980625(2) RenoEngineers,Inc. 1!? GooO., h, a.e -. -- RoneEn ineers
Dal;as. FO~ ',",,'Crtn Dallas. Texas Metro ;~972> 263-I 555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-184 Date of Observation 4;28,.'95 Report Date 06;25..'95
To Western Rim Services
Location PAVING NEXT TO BUILDING 38, SOUTHWEST CORNER, 10' EAST 5' SOUTH
Contractor
Supplier LATTIMORE Plant 6 I Truck 452 Ticket 6070799
Time Sampled 11:30 Time Batched 11:20 Weather Condition CLOUDY
Concrete Temperature I°F) 63 Ambient Temperature ICF) 70 Mix Number 36
Mix Description 4.50 SACKS W,'R AIR Unit Weight Water Added 15 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4 1/2
Concrete Cylinder Test(s)
No. (Days) (lbs.) Strength (psi) Strength Required ~ps)
1 5A 7 5/05 60000 21 20 3000/28 DAYS
B 28 5/26 70000 2480*
C 28 5/26 69000 2440'
D 56 6/23 85000 3010
ASTM C 31 ASTM C 39 I Area 28.27 sq. in.
Signature: Mike Fuller, i~/~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
L MI-AT!ONS: The test results presented herein were prepared based upon t.~e specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.? or any other feature of simdar subject matter prowded by
persons or conditions over which we have no control. Our '.etters and reports are for :he exclusive .Js8 of ;he clients to whom the,/ are
addressed.
c: wpw:n..reDcrts'.D7429-184-98 .ST .une 25. 1998