Mansions Phase 1-LR 980622 Bone Engineers. Inc. 1 1 W~-'~ GOOdmght Lane Tel. (,972) 24~.-45
Dal as. Fo.,1 Wo,lr, Dallas. Texas Metro (972),_~,,~-
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: I of 4
Report No: 3137-D7429-205 Sample Date: June 10, 1998
Client: Western Rim Services Report Date: June 22, 1998
Location: Building//5 Technician: K. Courtier
~ Tendon Location Jack Forcz Gauge Required Elongations Elongations Tolal W~thin
No. (Kips) Pressure E!ongations End (1) End (2) Elongations Toierance
I B29 East Side 33K 7800 2 1:8 2 1:8 Y
2 S29 East Side 33K 7800 2 1:8 2 1:4 Y
3 S48 East Side 33K 7800 3 5:8 4 y
4 B30 East Side 33K 7800 2 Z;$ 2 1;4 Y
5 B30 East Side 33K 7800 2 2;8 2 1:2 N See Note
6 B30 East Side 33K 7800 2 2,'8 2 3.'8 Y
7 B30 East Side 33K 7800 2 2:'8 2 3:'8 Y
8 B57 North Side 33K 7800 4 3;8 4 1:2 Y
9 S57 North Side 33K 7800 4 3:8 4 3;4 Y
10 B78 East Side 33K 7800 6 5 i;2 Y
11 S63 North Side 33K 7800 4 7;8 5 Y
12 S62 North Side 33K 7800 4 3;4 5 I;8 Y
13 B62 North Side 33K 7800 4 3;4 5 Y
14 S62 North Side 33K 7800 4 3;4 4 7/8 Y
15 562 North Side 33K 7800 4 3;4 4 3;4 Y
16 S65 North Side 33K 7800 5 5 1.8 Y
17 B65 North Side 33K 7800 5 5 1:4 Y
18 S65 North Side 33K 7800 5 5 3;4 N See Note
i9 S61 North Side 23K I 7800 4 5;8 q Y
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Cahbration Date:
Comments: Overpull - Structure already built on top of slab.
Distribution:
(1) Mr. Richard E. Sinunons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damon; C. D. Construction Consulting
LIMITATIONS: The test resuhs p:'esemeA he:'2in were prepared based upon the spezific samples provided I'or -'.esting. We assulne no
responsibility for variation in quality (composition. appearance. Fer:'crmance. etc.) or any other feature of similar sui~ect malter pro,, ided bx
persons or conditions over v,-hich we have no con:roL Our letters and :'eports are for the exclusive use of :he clients to 'o.'hool they are
addressed.
c::wpwin:reports\D7429-205-98'.SH lane 22. i998
none Engineers. Inc. 1 '1 ;>,:"-,t Goodnight Lane Tel. (972) 241-4517 A Rone
Dallas. Fort Worlr Dallas. Texas Metro,,~,"o"")'~, _6,.,-19 q ,.,,.,,.,~,~,
¢:229 i Fax(~7z) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 2 of 4
Report No: ~I~7-D74_9-_,0~ Sample Date: June 10, 1998
Client: Western Rim Services Report Date: June 22. 1998
Location: Building #S Technician: K. Courtier
# Tendon Location Jack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance
20 S61 North Side 33K 7800 4 5.-'8 4 1.'2 Y
21 B64 North Side 33K 7800 4 7.-'8 5 Y
22 S64 North Side 33K 7800 4 7.'8 5 !;8 Y
23 S64 North Side 33K 7800 4 7.'8 5 1:8 Y
24 S62 North Side 33K 7800 4 3.'4 4 3.'4 Y
25 S64 North Side 33K 7800 4 '7.8 5 i..'4 Y
26 B64 North Side 33K 7800 4 7-'8 5 i.-'4 Y
""~, S62 North Side 33K 7800 4 3.'4 ~q y
28 562 North Side 33K 7800 4 3-'4 5 Y
29 B69 North Side 33K 7800 5 1;'4 4 7."8 Y
30 569 North Side 33K 7800 5 1;4 5,,.;~"'~ Y
31 S69 North Side 33K 7800 5 1~4 5 5."8 Y
32 S69 Norlh Side 33K 7800 5 !..'4 5 5,"8 Y
33 B69 North Side 33K 7800 5 '.-'4 5 5."8 Y
34 S69 North Side 33K 7800 5 I.-'4 5 1.-2 Y
35 S69 North Side 33K 7800 5 1.-'4 5 1.-'2 Y
36 S69 North Side 33K 7800 5 :.-'4 5 5-8 Y
37 S61 North Side 33K 7800 4 5.'8 4 i.'2 Y
38 B32 North Side 33K 7800 '~.; 3.8 [ 2 1.:4 Y
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments:
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Se~'ices
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; Cit.,,' of Coppell
(1) Mr. Tony Martin; Newport Classic
(l) Mr. Doyle Damron; C. D. Construction Consulting
LI~IITATIONS: The test results presented herein were prepared based upon tl'~e specific samples provided fi~r testing. We assume no responsibility for ',-ariafion in
quaiity (composition, appearance, performan.:e, etc.) or any other t'e:,ture of si~ni[ar subject matter provided by persons or conditions over which '~e have no control.
Our letters and reports are. for the exclusive use or' the clients to x,,hom th.:'y are addressed.
c:';x-pwin'.reports'~D'7.'429-205-98'.SH June 2% 1998
. Flone Engineers. Inc. 1 '1 '".-,t Goodnight Lane Tel. (972) 241-4517 A Rone
Da~as. ~orl ',"qortr Dallas, Texas Metro (972) 263-i 555
75229 Fax (972) 241-5174
ELONGATION' REPORT
Project: Mansions Bv The Lake Page: 3 of 4
Report No: 3137-D7429-205 Sample Date: June 10, 1998
Client: Western Rim Services Report Date: June 22. 1998
Location: Building//5 Technician: K. Courtier
.s Tendon Location Jack Force Gauge Required Elongations Elongations Total Within
No. (K[ps.t Pressure Elongations End ','i) End :2) Elongations Tolerance
39 S32 North Side 33K 7800 2 3:8 2 1/2 Y
40 S61 West Side 33K 7800 4 5-8 4 3;4 Y
41 B61 West Side 33K 78(30 4 5-8 5 Y
42 S70 West Side 33K 7800 5 3:8 5 1:2 Y
43 S98 West Side 33K 7800 '~ 5:,'t 8 1:8 Y
44 SI01 West Side 33K 7800 7 %8 8 /.:4 Y
45 SI01 West Side 33K 7800 7 7/8 8 Y
46 B75 West Side i 331~ 7800 5 3/4 5 3:4 y
47 S102 West Side 33K 7800 7 758 8 Y
48 S102 West Side 33K 7800 7 7/8 8 1:2 Y
49 SI02 West Side 33K 7800 7 %8 8 1.'4 Y
50 B76 West Side 33K 7800 5 7/8 6 Y
51 S98 West Side 33K 7800 7 5/8 7 1:2 Y
52 S98 West Side 33K 7800 7 5/8 7 1:2 Y
53 S98 West Side 33K 7800 7 5i8 8 Y
54 S98 West Side 33K 78.00 7 5:8 8 Y
55 SI01 West Side 33K 7800 7 7:8 8 1:4 Y
56 B74 West Side 33K 7800 5 3.'4 5 !;2 Y
Equipment ID: Ram Nc): Pump Nc): Gauge Nc):
Equipment Calibration Date:
Comments:
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis: City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
L/\I1TATIONS: The test results presented herein were prepared based upon the specific samples provided for :esting. We assume no responsibility ;'or ;'aria:ion in
quality (composition. appearance, performance, etc.) or tiny other feature al' similar subject matter provided by persons or conditions over ',~hich ;~e ha;'~' no control.
Our letters and repons are for the exclusix-e use or' the ci:,ents to whom :he.v are addressed.
:'-.wpv,-in'..repons:D7429-205-98'.S H June 22.
Rone Engineers, Inc. 11 p,=,--t Goodnight Lane Tel. (972) 241-4517 -- RoneEn '
Da,as:Forl, wo~r' Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 4 of 4
.., ,n -) ,3 ~
Report No: ,1,>7-D74~9-_0> Sample Date: June 10, 1998
Client: Western Rim Services Report Date: June 22, 1998
Location: Building//5 Technician: K. Courtier
.7 Tendon Location Jack Force Gauge Required Elongations Elongations Total Wigqin
No. ('Kips) Pressure Elongations End [i) End (2) Elongations Tolerance
58 SI01 West Side 33K ?800 7 7:8 8 3/8 Y
59 SI01 West Side 33K '7800 7 7.8 7 758 Y
60 B79 West Side 33K 7800 6 1:8 6 :;8 Y
61 515 South Side 33K 7800 1 1 Y
62 S27 West Side 33K 7800 2 2 Y
63 S27 West Side 33K 7800 2 2 Y
64 B27 West Side 33K 78,90 2 2 Y
I I
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments:
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(I) Mr. Doyle Damron; C. D. Construction Consulting
LIaMrrATIONS: The test results presented herein ',x-ere prepared based upoa :he spezi[~c samples pro'.ided K;r testing. We assmne no responsibility :'or variation in
quality (composition, appearance, performance. ,nco or any other t~ature of similar sub.'.'ect matter provided by persons or conditions (),.-er ',xhich :~e have no control.
Our leuers and reports are for the exclusive use of the clients to '),-b. om ti:ey are addresse~.
c:'wpwin'reports'-.D742998'.SH June 22. ;.~98