Mansions Phase 1-LR 980622 (2) Rone Engineers. Inc. 11'--~'~ Goodnigh! Lane Te,. (972) 241-4517-- RoneE
Da:,as. For1 Wor':..". Dallas. Texas Metro ..:,, ~ 2) 263-1555
75229 Fax fo72~ 24i-5174
ELONGATION REPORT
Project: Mansions Bv The Lake Page: I of 4
Report No: 3137-D7429-207 Sample Date: June 10, 1998
Client: Western Rim Services Report Date: June 22. 1998
Location: Building #39 Technician: K. Courtier
# Tendon Location Jack Force Gauge Required Elongations ' Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance
t 829 East Side 33K 7860 2 1:8 2 Y
.: S29 East Side 33K 7800 2 I-'8 2 1.4 y
3 S:8 East Side 33K 7800 I 3 5 8 3 7.'8 Y
4 830 East Side 33K ?800 2 ~ 8 2 1'8 Y
5 830 East Side 33K 7800 2 2.'8 2 1.8 Y
6 B30 East Side 33K 7800 "2.'8
= 3 5.8 N See Note
7 B30 East Side 33K 7400~ .:.~' 2.8 ~ 3-'8 Y
8 B57 Noah Side 33K 7800 4 3.'8 4 1-2 Y
0. S57 Norlh Side 33K 7800 4 3.'8 4 .-.~"* y
I0 B78 East Side 33K 8000 5 5 1.'2 Y
1 i S63 Nor'& Side 33K 7800 4 7 '8 4 3..'4 Y
12 S62 North Side 33K 7800 4 3-'4 5 Y
13 B62 North Side 33K 7800 4 3.-'.: 5 Y
~4 562 North Side 33K 7800 4 3..'4 5 Y
15 S62 North Side 33K 7800 4 3.-'4 5 1.'8 Y
16 S65 North Side 33K 7800 5 5 1,'4 Y
17 B65 North Side 33K 7800 5 5 !.-'4 Y
18 S65 North Side 33K 7800 5 ] 5 !-4 Y
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments: Overpull.
Distribution:
t) Mr. Richard E. Sirmnons: Western Rim Services
1) Mr. Larry Davis; City' of Coppell
1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
fl') Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: Th,: test resuits presented herein '.,,'ere prepare,:; based upon :he specific samples provided ~Br testing. We assume no
responsibility l'or variation in .lU:,!ity (composition. aFpearance, per:¥r.':~ance, etc.) or an.,.' other :~ature of similar subject matter provided by
persons or :ondhions over '.vhL:h 'ac llave no control. Our letters anJ reports are ¢,;r the exchlsive use o£ t~e clients to '.vhom t~.ev are
addressed.
~ ::wp~-in:repoas'.D7429-207-')8 .SH June 22..'998
...... Ronelineers
Dallas For: '¢./o¢.", Dallas. Texas Metro ;'o72', 263-1555
75229 Fax ,.97zj 241-5174
ELONGATION REPORT
Project: Mansions By The kake Page:.~ '~ of 4
Report No: 3137-D7429-207 Sample Date: June 10, 1998
Client: Western Rim Services Report Date: June 22, 1998
kocation: Building #39 Technician: K. Courtier
~ Tendon Location Jack Force Gauge Required E:,mgations Eiongations Total Within
No. (K ps) Pressure Elongations End .,1) End 2'~ Elongations Tolerance
20 561 North Side 33K 7800 4 5-8 5 Y
21 B64 North Side 33K 7800 -: 7-'8 5 Y
22 S64 North Side 33K 7800 4 '7-8 5 !.'4 y
23 S64 Noah Side 33K 7800 4 7/8 5 1:8 Y
24 S62 North Side 33K 780;3 4 3:4 5 Y
25 S64 North Side 33K 7800 4 7.8 q I-'8 Y
26 B64 Noah Side 33K 7800 ~ 7.'8 5 i.-'8 Y
~7 S62 North Side 33K 7800 a 3.a 5 Y
28 S62 North Side 33K 7800 4 3.4 4 3.-'-1 y
29 B69 North Side 33K 7800 5 : '4 5 :."2 Y
30 -869 North Side ' 33K '7800 5 ;.'4 5 1.-'4 Y
31 S69 North Side 33K 7800 5 i.'4 5 5."8 Y
32 S69 North Side 33K 7800 5 ::4 6 N See Note
33 B69 Noah Side 33K 7800 5 i-'4 6 N See Note
34 S69 North Side 33K 7800 I 5 !-'4 5 5."8 Y
35 S69 North Side 33K 7800 5 '..-'-1 5 [.2 Y
36 S69 Nocth Side 33K 7500 5 ' '4
,.' 6 N See Note
37 S61 North Side 33K 7800 4 5/8 5 Y
Equipment ID: Ram No: Pump No: Gange No:
Equipment Calibration Date:
Comments: Overpull.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis: City of Coppell
(1) Mr. Lee Stone: City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron: C. D. Construction Consulting
LD, trrATIONS: The test rcsu!ts presented herein were prepared based upor, :he specific samples provided t'or testing. We assume no re<.'.cnsibilily ."or variation in
quality (composition, appearance, per'5.}rmance, etc.; or any ,.)th~'r l~a.'.ure c:' similar subject matter provided by persons t>r conditions over which '~,'e haxe at: eon.'.rcl.
Our letters and repons are for the exclusive use of :he clients lo ;',horn tine.'.' are addressed.
.wpx~ in-.repoas~D7429-207-98'.SH Jane 22. 1998
Rone Engineers. Inc. 11 "~,t Goodnight Lane Tel. (972) 241-4517 -- -- -o.RoneEnoineers
Daflas. Foq ',"4crtn Dallas. Texas Metro (972) 263-1555 ~~
75229 Fax ,;,972) 241-5: 7a
ELONGATION REPORT
Project: Mansions By The Lake Page: 3 of 4
Report No: 3137-D7429-207 Sample Date: June i0, 1998
Client: Western Rim Services Report Date: June 22, 1998
Location: Building #39 Technician: K. Courtier
# Tendon Location Jack Forc~ Gauge Required E:cngaticns E!ongations To~ai x3,'i;~in
No. (Kips) Pr:ssur~ Elongations End ,'.1) End :'2'; Elongations Tolerance
39 S32 North Side 33K . 7800 2 3:8 2 1'2 Y
40 S61 West Side 33K 7800 4 5'8 5 Y
41 B61 West Side 33K 7800 -1 5.-'8 5 Y
42 S70 West Side 33K 7800 5 3.-'8 5 3.4 y
43 S98 West Side 33K 7800 7 5."8 8 Y
44 S101 West Side 33K 7800 7 7.-'8 8 3.8 Y
45 Sl01 West Side 33K 7800 7 7;8 8 Y
46 B75 West Side 33K 7800 5 3.'4 5 5.8 Y
47 SI02 West Side 33K 7800 7 7.8 8 Y
48 S102 West Side 33K 7800 7 7:8 8 1:2 Y
49 S102 West Side 33K '~800 7 7:8 8 3.-' N See Note
50 B76 West Side, 33K 7800 5 7:8 6 Y
51 S98 West Side 33K 7800 7 5.8 8 1:4 N See Note
52 S98 West Side 33K 7800 ? 5:8 8 3:8 N See Note
53 S98 1,Vest Side 33K 7800 .7 5-8 8 3.8 N See Note
54 S98 West Side 33K 7800 7 5-8 8 Y
55 S101 West Side 33K 780(; '7 7'8 8 1.2 Y
56 B74 West Side 33K 7800 5 3-4 6 i.'4 5'
57 Si01 West Side 3~K 7800 7 '7:8 8 3/8 Y
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments: Overpull.
Distribution:
(I) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(l) Mr. Doyle Damron: C. D. Construction Consulting
LD. IrFATIONS: The test results presented i:ercin 'a.'~r~ prepared based upon ti:e specifi; san:pies provided for testing. We assume no responsibi;ity fc-r var:atkm in
quality (;omposition. appearan:e, per(ormanc:, at,:.j or any o;!:er feature of similar su~je~'t matter provided by persons or conditions over ',t hich ,xe ~a'~c no ;ontro;.
Our letters and reports are for the exclusive use of tl~e :lien'.s to ',thom :he,x arc addressed.
;:'.xg-pwin'-.repogs:D7429-207-98'.SH June 22. 295;8
Rode Engineers, Inc. 11 .... Gooanlght Lane Tel.~', 24~-4~,~ RoneEnajneers
i
Dallas'For:, '¢,/c.,"t.h Dallas. Texas Metro (972) _6o-, 555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 4 of 4
Report No: 3137-D7429-207 Sample Date: June 10. 1998
Client: Western Rim Services Report Date: June~=."" 1998
Location: Building//39 Technician: K. Courtier
~ Tendon Location Jack Force Gauge Required E!ongations Elongations Total Within
No. (Kips) Pressure E;.ongations End i'l, .~ End .,-.,"~Elongations Tolerance
58 S101 West Side 33K 7800 ? 7.'8 8 7.-'8 N See Note
59 SI01 ~,¥est Side 33K 7800 '7.' 7.'8 8 i."2 Y
60 B79 West Side 33K 7800 6 1.8 6 :.-'4 Y
61 S15 South Side 33K 780('! i 2 Y
62 S27 West Side 33K 7800 ~ 2 i-'4 N See Note
63 S27 West Side 33K 7800 2 2 Y
64 B27 West Side 33K 7800 ~ 2 ~-'8 Y
I I I
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments: Overpull.
Distribution:
(1) Mr. Richard E. Sinm~ons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; Cit.',' of Coppell
(1) Mr. Tony .Martin: Newport Classic
(l) Mr. Doyle Damron: C. D. Construction Consulting
LI'MITATIONS: The test results presented herein were prepared based ~'pon :b,e spec[tic samples provided :'or testing. We assume no responsibility ;'or variation in
quality (composition, appearance, performance, etc.) or any other feature or' slmiiar subject matter provided by persons or :onditions over which ',~,'e have no control.
Our letters and reports are for the exclusive usc or. the c'.ients to whom -',hey are address-ed.
c :'wpwin'reports' D742998'..SH June 22. 1998