Loading...
Mansions Phase 1-LR 980622 (2) Rone Engineers. Inc. 11'--~'~ Goodnigh! Lane Te,. (972) 241-4517-- RoneE Da:,as. For1 Wor':..". Dallas. Texas Metro ..:,, ~ 2) 263-1555 75229 Fax fo72~ 24i-5174 ELONGATION REPORT Project: Mansions Bv The Lake Page: I of 4 Report No: 3137-D7429-207 Sample Date: June 10, 1998 Client: Western Rim Services Report Date: June 22. 1998 Location: Building #39 Technician: K. Courtier # Tendon Location Jack Force Gauge Required Elongations ' Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance t 829 East Side 33K 7860 2 1:8 2 Y .: S29 East Side 33K 7800 2 I-'8 2 1.4 y 3 S:8 East Side 33K 7800 I 3 5 8 3 7.'8 Y 4 830 East Side 33K ?800 2 ~ 8 2 1'8 Y 5 830 East Side 33K 7800 2 2.'8 2 1.8 Y 6 B30 East Side 33K 7800 "2.'8 = 3 5.8 N See Note 7 B30 East Side 33K 7400~ .:.~' 2.8 ~ 3-'8 Y 8 B57 Noah Side 33K 7800 4 3.'8 4 1-2 Y 0. S57 Norlh Side 33K 7800 4 3.'8 4 .-.~"* y I0 B78 East Side 33K 8000 5 5 1.'2 Y 1 i S63 Nor'& Side 33K 7800 4 7 '8 4 3..'4 Y 12 S62 North Side 33K 7800 4 3-'4 5 Y 13 B62 North Side 33K 7800 4 3.-'.: 5 Y ~4 562 North Side 33K 7800 4 3..'4 5 Y 15 S62 North Side 33K 7800 4 3.-'4 5 1.'8 Y 16 S65 North Side 33K 7800 5 5 1,'4 Y 17 B65 North Side 33K 7800 5 5 !.-'4 Y 18 S65 North Side 33K 7800 5 ] 5 !-4 Y Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Overpull. Distribution: t) Mr. Richard E. Sirmnons: Western Rim Services 1) Mr. Larry Davis; City' of Coppell 1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic fl') Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: Th,: test resuits presented herein '.,,'ere prepare,:; based upon :he specific samples provided ~Br testing. We assume no responsibility l'or variation in .lU:,!ity (composition. aFpearance, per:¥r.':~ance, etc.) or an.,.' other :~ature of similar subject matter provided by persons or :ondhions over '.vhL:h 'ac llave no control. Our letters anJ reports are ¢,;r the exchlsive use o£ t~e clients to '.vhom t~.ev are addressed. ~ ::wp~-in:repoas'.D7429-207-')8 .SH June 22..'998 ...... Ronelineers Dallas For: '¢./o¢.", Dallas. Texas Metro ;'o72', 263-1555 75229 Fax ,.97zj 241-5174 ELONGATION REPORT Project: Mansions By The kake Page:.~ '~ of 4 Report No: 3137-D7429-207 Sample Date: June 10, 1998 Client: Western Rim Services Report Date: June 22, 1998 kocation: Building #39 Technician: K. Courtier ~ Tendon Location Jack Force Gauge Required E:,mgations Eiongations Total Within No. (K ps) Pressure Elongations End .,1) End 2'~ Elongations Tolerance 20 561 North Side 33K 7800 4 5-8 5 Y 21 B64 North Side 33K 7800 -: 7-'8 5 Y 22 S64 North Side 33K 7800 4 '7-8 5 !.'4 y 23 S64 Noah Side 33K 7800 4 7/8 5 1:8 Y 24 S62 North Side 33K 780;3 4 3:4 5 Y 25 S64 North Side 33K 7800 4 7.8 q I-'8 Y 26 B64 Noah Side 33K 7800 ~ 7.'8 5 i.-'8 Y ~7 S62 North Side 33K 7800 a 3.a 5 Y 28 S62 North Side 33K 7800 4 3.4 4 3.-'-1 y 29 B69 North Side 33K 7800 5 : '4 5 :."2 Y 30 -869 North Side ' 33K '7800 5 ;.'4 5 1.-'4 Y 31 S69 North Side 33K 7800 5 i.'4 5 5."8 Y 32 S69 North Side 33K 7800 5 ::4 6 N See Note 33 B69 Noah Side 33K 7800 5 i-'4 6 N See Note 34 S69 North Side 33K 7800 I 5 !-'4 5 5."8 Y 35 S69 North Side 33K 7800 5 '..-'-1 5 [.2 Y 36 S69 Nocth Side 33K 7500 5 ' '4 ,.' 6 N See Note 37 S61 North Side 33K 7800 4 5/8 5 Y Equipment ID: Ram No: Pump No: Gange No: Equipment Calibration Date: Comments: Overpull. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis: City of Coppell (1) Mr. Lee Stone: City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron: C. D. Construction Consulting LD, trrATIONS: The test rcsu!ts presented herein were prepared based upor, :he specific samples provided t'or testing. We assume no re<.'.cnsibilily ."or variation in quality (composition, appearance, per'5.}rmance, etc.; or any ,.)th~'r l~a.'.ure c:' similar subject matter provided by persons t>r conditions over which '~,'e haxe at: eon.'.rcl. Our letters and repons are for the exclusive use of :he clients lo ;',horn tine.'.' are addressed. .wpx~ in-.repoas~D7429-207-98'.SH Jane 22. 1998 Rone Engineers. Inc. 11 "~,t Goodnight Lane Tel. (972) 241-4517 -- -- -o.RoneEnoineers Daflas. Foq ',"4crtn Dallas. Texas Metro (972) 263-1555 ~~ 75229 Fax ,;,972) 241-5: 7a ELONGATION REPORT Project: Mansions By The Lake Page: 3 of 4 Report No: 3137-D7429-207 Sample Date: June i0, 1998 Client: Western Rim Services Report Date: June 22, 1998 Location: Building #39 Technician: K. Courtier # Tendon Location Jack Forc~ Gauge Required E:cngaticns E!ongations To~ai x3,'i;~in No. (Kips) Pr:ssur~ Elongations End ,'.1) End :'2'; Elongations Tolerance 39 S32 North Side 33K . 7800 2 3:8 2 1'2 Y 40 S61 West Side 33K 7800 4 5'8 5 Y 41 B61 West Side 33K 7800 -1 5.-'8 5 Y 42 S70 West Side 33K 7800 5 3.-'8 5 3.4 y 43 S98 West Side 33K 7800 7 5."8 8 Y 44 S101 West Side 33K 7800 7 7.-'8 8 3.8 Y 45 Sl01 West Side 33K 7800 7 7;8 8 Y 46 B75 West Side 33K 7800 5 3.'4 5 5.8 Y 47 SI02 West Side 33K 7800 7 7.8 8 Y 48 S102 West Side 33K 7800 7 7:8 8 1:2 Y 49 S102 West Side 33K '~800 7 7:8 8 3.-' N See Note 50 B76 West Side, 33K 7800 5 7:8 6 Y 51 S98 West Side 33K 7800 7 5.8 8 1:4 N See Note 52 S98 West Side 33K 7800 ? 5:8 8 3:8 N See Note 53 S98 1,Vest Side 33K 7800 .7 5-8 8 3.8 N See Note 54 S98 West Side 33K 7800 7 5-8 8 Y 55 S101 West Side 33K 780(; '7 7'8 8 1.2 Y 56 B74 West Side 33K 7800 5 3-4 6 i.'4 5' 57 Si01 West Side 3~K 7800 7 '7:8 8 3/8 Y Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Overpull. Distribution: (I) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (l) Mr. Doyle Damron: C. D. Construction Consulting LD. IrFATIONS: The test results presented i:ercin 'a.'~r~ prepared based upon ti:e specifi; san:pies provided for testing. We assume no responsibi;ity fc-r var:atkm in quality (;omposition. appearan:e, per(ormanc:, at,:.j or any o;!:er feature of similar su~je~'t matter provided by persons or conditions over ',t hich ,xe ~a'~c no ;ontro;. Our letters and reports are for the exclusive use of tl~e :lien'.s to ',thom :he,x arc addressed. ;:'.xg-pwin'-.repogs:D7429-207-98'.SH June 22. 295;8 Rode Engineers, Inc. 11 .... Gooanlght Lane Tel.~', 24~-4~,~ RoneEnajneers i Dallas'For:, '¢,/c.,"t.h Dallas. Texas Metro (972) _6o-, 555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansions By The Lake Page: 4 of 4 Report No: 3137-D7429-207 Sample Date: June 10. 1998 Client: Western Rim Services Report Date: June~=."" 1998 Location: Building//39 Technician: K. Courtier ~ Tendon Location Jack Force Gauge Required E!ongations Elongations Total Within No. (Kips) Pressure E;.ongations End i'l, .~ End .,-.,"~Elongations Tolerance 58 S101 West Side 33K 7800 ? 7.'8 8 7.-'8 N See Note 59 SI01 ~,¥est Side 33K 7800 '7.' 7.'8 8 i."2 Y 60 B79 West Side 33K 7800 6 1.8 6 :.-'4 Y 61 S15 South Side 33K 780('! i 2 Y 62 S27 West Side 33K 7800 ~ 2 i-'4 N See Note 63 S27 West Side 33K 7800 2 2 Y 64 B27 West Side 33K 7800 ~ 2 ~-'8 Y I I I Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Overpull. Distribution: (1) Mr. Richard E. Sinm~ons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; Cit.',' of Coppell (1) Mr. Tony .Martin: Newport Classic (l) Mr. Doyle Damron: C. D. Construction Consulting LI'MITATIONS: The test results presented herein were prepared based ~'pon :b,e spec[tic samples provided :'or testing. We assume no responsibility ;'or variation in quality (composition, appearance, performance, etc.) or any other feature or' slmiiar subject matter provided by persons or :onditions over which ',~,'e have no control. Our letters and reports are for the exclusive usc or. the c'.ients to whom -',hey are address-ed. c :'wpwin'reports' D742998'..SH June 22. 1998