Loading...
Mansions Phase 1-LR 980619 i Dauas Fo,", '¢,/cch Dallas. Texas Metro (972) 263-1555 75229 Fax {972) 241-5174 GENERAL REPORT PROJECT: Mansions By The Lake REPORT NO: 3137-D7429-210 REPORT DATE: 06/19198 CLIENT: Western Rim Services SERVICE DATE: 06/15,"98 REPORT OF: CANCELLATION On this date, Kay Courtier, representing Rone Engineers, Inc., arrived on site at the above referenced project to perform an inspection on post-tension repair. Upon arrival, the technician was informed that this day's activities were cancelled. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Dovle Damron; C. D. Construction Consulting LhMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qualhy (composition. appearance, performance, ,:to.'} or any other f~ature of similar subject matter provided hy persons or conditions over which we have no control. Our letters and reports are for the exc[usive usa of the ciients to whom they are addressed. c: '~'p',*.i~ .-elx'.~'.D7z2~-210-9$'-SII l..:',~ 1O,