Mansions Phase 1-LR 980619 i
Dauas Fo,", '¢,/cch Dallas. Texas Metro (972) 263-1555
75229 Fax {972) 241-5174
GENERAL REPORT
PROJECT: Mansions By The Lake
REPORT NO: 3137-D7429-210 REPORT DATE: 06/19198
CLIENT: Western Rim Services SERVICE DATE: 06/15,"98
REPORT OF: CANCELLATION
On this date, Kay Courtier, representing Rone Engineers, Inc., arrived on site at the above
referenced project to perform an inspection on post-tension repair. Upon arrival, the
technician was informed that this day's activities were cancelled.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Dovle Damron; C. D. Construction Consulting
LhMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in qualhy (composition. appearance, performance, ,:to.'} or any other f~ature of similar subject matter provided hy
persons or conditions over which we have no control. Our letters and reports are for the exc[usive usa of the ciients to whom they are addressed.
c: '~'p',*.i~ .-elx'.~'.D7z2~-210-9$'-SII l..:',~ 1O,