Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-197B J Date of Observation 5~'06,'98 Report Date 06..'15/98
To Western Rim Services
Location DRIVEWAYS ON BUILDING 8, EAST SIDE DRIVEWAY AND NORTH SIDE DRIVEWAYS
Contractor
Supplier LATTIMORE J Plant 3 I Truck 734 Ticket 3062029
I
Time Sampled 3:10 Time Batched 3:00 Weather Condition CLEAR
Concrete Temperature (°F) 90 Ambient Temperature (°F) 95 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6.0
Concrete Cylinder Test(s)
Specimen I Age ] Test Date l TOtal Load Compressive
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
98A 7 5/1 3 68500 2420 3000/28 DAYS
B 28 6/03 93000 3290
C 28 6/03 92500 3270
D H
Curing Method Test Method Standard 6" x 12" I Engineer'rTechnician D. GODBEY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
I
Signature: Mike Fuller, ~ Supervisor, CMT
Remarks and/or Distribution~
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the spec:ftc sampies orovided for testing. We assume no
responsibliity for variation in quality (composition. appearance, performance, etc.) or any other feature of similar SubleCt matter prcvided b'¢
persons or conditions over which we nave no control. Our letters and reports are for the exclusive use of the clients to whom the,/ are
addressed.
c: wpw~n-.reports.D7429-197B-98'ST June "5, 1998