Magnolia Park-CS 980616COPPELL, TEXAS 75019
June 16, 1998
Elvio Bnmi
Eastern Development Companies
5225 Village Creek Drive, Suite 400
Plano, Texas 75093
RE: Roadway Impact Fee for Magnolia Park
Dear Mr. Bmni:
Attached are the revised Roadway Impact Fee calculations for the refen
requested in your May 28, 1998 letter to Jim Witt.
A check in the amount of $91,954.00 should be made payable to thc City of (
to Jennifer Armstrong, Finance Director, along with a copy of the attached
calculations.
Please provide a copy of your paid receipt to our office so that we will be abh
the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your convert[
Sincerely
· Martin, P.E.
Assistant City Engineer
Jennifer Armstrong, Finance Director
Glenn Hollowell Assistant Director of Public Services
Greg Jones, Building Official
Doug Stevens, Engineering Technician
PO. Box 478
CoppelI, Texas 75019
972-462-0022
~ced project as you
:oppell and forwarded
Roadway Impact Fee
to verify payment of
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Magnolia Park
DATE: 6/11/98 (REVISED)
ROADWAY IMPACT FEE:
Service Area *
Category ** Residential
Land Use ** Single-Family Detached
E~uilding Size (Sq. Ft.) N/A
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
114
2.85
$300
$97,470.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
A credit of $5,516.00 is provided due to dedication of
right-of-way as per letter to Jim Wilt dated May 28, 1998