Loading...
Mansions Phase 1-LR 980611Rone Engineers. Inc. 11--,. Goodnignt Lane TeL (972; 24'-45!7 -- RoneEnaineers i Ca as F-z.~ ','lon~ Dallas. Texas 75229 :ax :972) 2-"-:-5' 74 GENERAL REPORT PROJECT: Mansions By The Lake REPORT NO: 3137-D7429-202 REPORT DATE: 06/11/98 CLIENT: Western Rim Services SAMPLE DATE: 06/08,"98 REPORT OF: Post Tension Cable Inspection On the above service date, Kay Courtier, representing Rone Engineers, Inc., arrived on site at the above referenced project to inspect the post tension cables in need of repair. An agreement was met on the cables and buildings in question. The repairs will be performed on June 10, 1998. Distribution: (1) Mr. Richard E. Simmons: Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMrFATIONS: The test results presented herein were prepared based upon the spezifi,: samples provided for testing. We assume no responsibility for variation in quality ,';:omposition. appearanze, per£0r:nance, et,:.) or any other feature of similar subject matter provided bi,' persons or conditions over which we have no control. Our l~'tters and reports arc tut thc ex;lusiw' use of the clients to ,xhom they ar.' addressed. c:-'%tw-k'~-i~poru'.l)742¢-~-d2-gg SII J.--,c I I.