Magnolia Park-CS 980504 (2)COPPELL, TEXAS 75019
Bill Anderson, P.E.
Dowdey, Anderson & Associates, Inc.
5225 Village Creek Dr., Suite 200
Piano, TX 75093
Magnolia Park
Development Fee Assessment
Dear Mr Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, a;
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amo $356,460.00 and forw~
Finance Department along with a copy of the Fee Assessment table. This amot
of the assessed fees which need to be paid prior to Council approval. Please re:
table for additional fees. Also provide a copy of the Engineer's estimate or con
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help u
payment of required fees and insure a successful beginning of this project. We
to worldag with you on this project. If you have any questions, please contact
Sincerely,
Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Works
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
RO. Box 478
Coppell, Texas 75019
972-462-0022
May 4, 1998
ongwitha copy
xdto the
nt is a portion
~er to attached
tract to our office
to verify the
~ok forward
le.
,.,,EVELOPMENT FEE WORKSHEET
PROJECT Magnolia Park
DATE: 5/4/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
114 - 5/8 inch X 3/4 inch 114 ESU's
2 - 2 inch 16 ESU's
6 - 5/8 inch X 3/4 inch 6 ESU's
ESU's
Total #: 136 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 0: 122 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 114 Domestic Meter(s) @ $24.83
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 2 Irrigation Meter(s) @
Total #: 6 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$192.15
$24.83
Water Meter Deposit Fee (Domestic):
Total #: 114 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 8 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ES
114
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 114 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 114 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
$61,200.00
$6,100.00
$2,830.62
$384.30
$148.98
$o.00
$3,990.00
$240.00
$51,300.00
$5,700.00
$5,700.00
I.~EVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
114
N/A
Single-family @ $1285.00/Lot
Multi-family @ $1285.00/Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department,
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
N/A
N/A
N/A
N/A
$146,490. O0
N/A
$97,470.00
Information not
av ~ilable at this time
[n_formation not
available at this time
leed submittal of
dc elopment contracts
DEVELOPMENT FEE TABLE
Project: Magnolia Park
Date: 5/4/98
TOTAL AMOU~ DUE
FEES DUE PRIO~ TO
COUI~CIL
APPR~)VAL
Water Impact Fee $61,200.00 00.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $6,100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $2,830.62
(100 % due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $533.28
(100 % due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $3,990.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $240.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $51,300.00 00.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $5,700.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee II $5,700.00
(100% due at Issuance of Building Permit)
Park Fee $146,490.00 $14~J,490.00
1
(100 % due prior to Council Approval)
Roadway Impact Fee $97,470.00 70.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Projec available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Projec available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $381,553.90
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $35~,460.00
RO.,-~DWAY IMPACT FEE CALCULATIONS
PROJECT: Magnolia Park
DATE: 5/4/98
ROADWAY IMPACT FEE:
I[Service Area *
]Cate~or~ **
[Land Use **
'Building Size (Sq. Ft.)
Developmem Units **
Vehicle Miles per Developmem Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Developmem Unit) x (Fee per Vehicle Mile) =
1
Residemial
Single-Family Detach
N/A
114
2.85
$300
* (Figure 2 - Roadway Impact Fee ~
** (Table 3 - Roadway Impact Fee S1
*** (Schedule 2, Page 3 - Roadway In
$97,470.00