Loading...
Magnolia Park-CS 980504 (2)COPPELL, TEXAS 75019 Bill Anderson, P.E. Dowdey, Anderson & Associates, Inc. 5225 Village Creek Dr., Suite 200 Piano, TX 75093 Magnolia Park Development Fee Assessment Dear Mr Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, a; of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amo $356,460.00 and forw~ Finance Department along with a copy of the Fee Assessment table. This amot of the assessed fees which need to be paid prior to Council approval. Please re: table for additional fees. Also provide a copy of the Engineer's estimate or con so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help u payment of required fees and insure a successful beginning of this project. We to worldag with you on this project. If you have any questions, please contact Sincerely, Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services RO. Box 478 Coppell, Texas 75019 972-462-0022 May 4, 1998 ongwitha copy xdto the nt is a portion ~er to attached tract to our office to verify the ~ok forward le. ,.,,EVELOPMENT FEE WORKSHEET PROJECT Magnolia Park DATE: 5/4/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 114 - 5/8 inch X 3/4 inch 114 ESU's 2 - 2 inch 16 ESU's 6 - 5/8 inch X 3/4 inch 6 ESU's ESU's Total #: 136 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 0: 122 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 114 Domestic Meter(s) @ $24.83 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 2 Irrigation Meter(s) @ Total #: 6 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $192.15 $24.83 Water Meter Deposit Fee (Domestic): Total #: 114 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 8 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ES 114 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 114 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 114 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $61,200.00 $6,100.00 $2,830.62 $384.30 $148.98 $o.00 $3,990.00 $240.00 $51,300.00 $5,700.00 $5,700.00 I.~EVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 114 N/A Single-family @ $1285.00/Lot Multi-family @ $1285.00/Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department, (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 N/A N/A N/A N/A $146,490. O0 N/A $97,470.00 Information not av ~ilable at this time [n_formation not available at this time leed submittal of dc elopment contracts DEVELOPMENT FEE TABLE Project: Magnolia Park Date: 5/4/98 TOTAL AMOU~ DUE FEES DUE PRIO~ TO COUI~CIL APPR~)VAL Water Impact Fee $61,200.00 00.00 (100% due prior to Council Approval) Water Tap Inspection Fee $6,100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,830.62 (100 % due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $533.28 (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $3,990.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $240.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $51,300.00 00.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $5,700.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee II $5,700.00 (100% due at Issuance of Building Permit) Park Fee $146,490.00 $14~J,490.00 1 (100 % due prior to Council Approval) Roadway Impact Fee $97,470.00 70.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Projec available at this time Street Sign Fee Information not (100% due prior to Acceptance of Projec available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $381,553.90 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $35~,460.00 RO.,-~DWAY IMPACT FEE CALCULATIONS PROJECT: Magnolia Park DATE: 5/4/98 ROADWAY IMPACT FEE: I[Service Area * ]Cate~or~ ** [Land Use ** 'Building Size (Sq. Ft.) Developmem Units ** Vehicle Miles per Developmem Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Developmem Unit) x (Fee per Vehicle Mile) = 1 Residemial Single-Family Detach N/A 114 2.85 $300 * (Figure 2 - Roadway Impact Fee ~ ** (Table 3 - Roadway Impact Fee S1 *** (Schedule 2, Page 3 - Roadway In $97,470.00 :mdy) udy) )act Fee Study)