Mansions Phase 1-LR 980529 (2) Rone Engineers, Inc. 1 ~'"~4 Goodnight Lane Tel. (972) 241-451-'-" RoneEnqineers
Dallas,'Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-190 ] Date of Observation 4..-"29/98 Report Date 05i29,'98
I
To WesTern Rim Services
Location BUILDING 38, SOUTHWEST CORNER, 10' NORTH, 3' EAST
Contractor
Supplier LATTIMORE Plant 3 ]Truck 631 Ticket 6070881
Time Sampled 8:40 Time Batched 8:30 WeaTher Condition CLEAR
Concrete Temperature (CF) 60 Ambient Temperature (CF) Mix Number 51
Mix Description 3000 PSI W/R AIR Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4 1/2
Concrete Cylinder Test(s)
I IT°tal L°ad C°mpressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
96A 7 5/06 75000 2630 3000/28 DAYS
6 28 5/27 11 6000 4100
C 28 5/27 1 24000 4390
D H
Curing Method I TestMethod I Standard 6" x12" Engineer;%echnicianD. GODBEY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller,~/~ Supervisor, CMT
Remarks and/or Distributiort'~'
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition. appearance, performance, etc. I or aoy other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the c~ientsto whom they are
:~udressed
c: ,,~pwin:reports'.D7429-190-98'.ST Ma',' 29 i998