Mansions Phase 1-LR 980529 (3) Rone Engineers, Inc. 1 ~""4 Goodnight Lane Tel. (972) 241-451-'-" RoneEn( ineers
J
Dal~as,'Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-191 I Date of Observation 4/29/98 Report Date 05..'.."29..'.98
I
To Western Rim Services
Location PAVING BEHIND BUILDING 10, NORTHEAST CORNER, 5" WEST 5" NORTH
Contractor
Suppher LATTIMORE Plant 6 Truck 802 Ticket 5070892
Time Sampled 12:i0 Time Batched 12:00 Weather Condition CLEAR
Concrete Temperature (°F) 67 Ambient Temperature (°F) Mix Number 61
Mix Description 3000 PSI W/R AIR Unit Weight Water Added 35 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 8.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
97A 7 5/06 52000 1840 3000.,'28 DAYS
B 28 5/27 76000 2690
C 28 5..'.27 90000 3180
D 28 5i27 90000 31 80
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, Jf~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based open the specific samples provided for testing. We assume no
-esponsibilit¥ for venation in quality (composition. appearance, performance, etc.l or any other feature of simdar subject matter prowded by
persons or cof'lditlOl~S over which we have no control Our letters and reports are for the exclusive rise of the clients to whom they are
ad(lressed.
c. ~,,pwi~.reports'.D7429- 191-98~ST May 29. 199~