Loading...
Mansions Phase 1-LR 980529 (4)Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-125 Date of Observation 4.,"02/98 Report Date 05..'29/98 To Western Rim Services Location BUILDING #35, SOUTHEAST CORNER SLAB Contractor Supplier LATTIMORE MATERIALS I Plant 3 I Truck 820 Ticket 3060100 I I Time Sampled 6:35 Time Batched Weather Condition PT CLOUDY Concrete Temperature (°F) 64 Ambient Temperature t°F) 53 Mix Number 14 Mix Description 4.50 SACKS W/R Unit Weight Water Added 20 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.75 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 69A 7 4/09 71000 2510 3000/28 DAYS B 28 4/30 71000 2510* C 28 4/30 88000 3110 D 56 5/28 98000 3470 Curing Method I TestMethod I Standard 6" x12" Engineer/q'echnicianR. YARBROUGH ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, ¢ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, perforrnance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c Wpwln'.reports'.D7429-125-98~.ST May 29. 1998