Loading...
Mansions Phase 1-LR 980529 (5) R~r~ Efsejin~er~. lac. ! ~...-?..34 Gooa.mgm Lane Te: :972.. 2ai-45~ ineers Da,las. F;}¢ -.'~c~ Da.as. Texas Metre ;9727 263-15o5 75229 :ax :9~2~::~""-~7~ Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-126 I Date of Observation 4:02/98 Report Date 05/29/98 I To Western Rim Services Location BUILDING #35, NORTHWEST CORNER SLAB Contractor Supplier LATTIMORE MATERIALS Plant 3 I Truck 618 Ticket 3060133 Time Sampled 8:00 Time Batched 7:30 Weather Condition PT CLOUDY Concrete Temperature (CF) 68 Ambient Temperature (3F) 60 Mix Number 14 Mix Description 4.50 SACKS W/R Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.5 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 70A 7 4/09 66000 2330 3000,.'28 DAYS B 28 4/30 76000 2690* C 28 4/30 80000 2830* D 56 5/28 91000 3220 Curing Method Test Method I Standard 6" x 12" Engineer/-I'echnician R. YARBROUGH ASTM C31 ASTM C39I Area 28.27 sq. in. Signature: Mike Fuller, ~'~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services {1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting _iMITATIONS: The test results presented hereto were prepared based upon the specific samples provided for testif~g. We assume no responsibility tot variation in quality (composition. appearance, performance, etc.) or any other feature of su~ilar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c::wpwin'.reports\D7429-126-98tST May 29. 1998