Loading...
Mansions Phase 1-LR 980529 (6) Rone Engineers. Inc. 1 ~,4 Goo(::n,gh! Lane :'-e. ?:':..~.~,:~:~:-:~ Rone Engineers Ca,as:For -,'~oq~ Dallas. Texas Me:r3 ..~ .- :~ _ ~-1 ~ 75229 =ax :.572' 9~- 5~7' Concrete Cylinder Test Report Project MANSIONS BY THE LAKE Purchase Order Number 3137-D7429-131 Date of Observation 4;03/98 Report Date 05/29/98 To WESTERN RIM SERVICES Location TIE IN NORTH OF BUILDING #35, NORTHWEST CORNER SLAB Contractor EDWARDS CONCRETE .-, Supplier LATTIMORE Plant 7 I Truck 572 Ticket 7049138 Time Sampled 8:45 Time Batched 8:02 Weather Condition CLEAR Concrete Temperature (°F) 72 Ambient Temperature (°F) 70 Mix Number 14 Mix Description 4.50 SACKS W...'R Unit Weight Water Added 30 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 8.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 74A 7 4/10 63500 2250 3000/28 DAYS B 28 5/01 84000 2970' C 28 5/01 85000 3010 D 56 5/29 95000 3360 ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, ¢ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting ~IMITATIONS: The test results presented here~n were prepared based upon the specific samples provided for testing. We assume no lesponsibility for variation in quality (composition, appearance, performance, etc.i or any other feature of s=milar subject matter provided by persons orcondit~ons over which we have no control. Our letters and reports 3re fcr*,he exclusive use of the clients to whom they are aadressed. c wpwm-repor[s'.D7429-131-98'.ST May 29. ~998