Mansions Phase 1-LR 980529 (6) Rone Engineers. Inc. 1 ~,4 Goo(::n,gh! Lane :'-e. ?:':..~.~,:~:~:-:~ Rone Engineers
Ca,as:For -,'~oq~ Dallas. Texas Me:r3 ..~ .- :~ _ ~-1 ~
75229 =ax :.572' 9~- 5~7'
Concrete Cylinder Test Report
Project MANSIONS BY THE LAKE Purchase Order
Number 3137-D7429-131 Date of Observation 4;03/98 Report Date 05/29/98
To WESTERN RIM SERVICES
Location TIE IN NORTH OF BUILDING #35, NORTHWEST CORNER SLAB
Contractor EDWARDS CONCRETE
.-,
Supplier LATTIMORE Plant 7 I Truck 572 Ticket 7049138
Time Sampled 8:45 Time Batched 8:02 Weather Condition CLEAR
Concrete Temperature (°F) 72 Ambient Temperature (°F) 70 Mix Number 14
Mix Description 4.50 SACKS W...'R Unit Weight Water Added 30 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 8.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
74A 7 4/10 63500 2250 3000/28 DAYS
B 28 5/01 84000 2970'
C 28 5/01 85000 3010
D 56 5/29 95000 3360
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, ¢ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
~IMITATIONS: The test results presented here~n were prepared based upon the specific samples provided for testing. We assume no
lesponsibility for variation in quality (composition, appearance, performance, etc.i or any other feature of s=milar subject matter provided by
persons orcondit~ons over which we have no control. Our letters and reports 3re fcr*,he exclusive use of the clients to whom they are
aadressed.
c wpwm-repor[s'.D7429-131-98'.ST May 29. ~998