Mansions Phase 1-LR 980515 (2) Rone Engineers, Inc. 1"-~4 Goodnight Lane Tel. (972)241-45'. i l / lineers
Dallas,:Eon Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-155 Date of Observation 4/14/98 Report Date 05/15/98
To Western Rim Services
Location BUILDING #35 FROM THE SOUTHWEST CORNER, 47' NORTH AND 25' EAST
Contractor
Supplier LATTIMORE Plant 6 I Truck 803 Ticket 6070027
I
Time Sampled 8:30 Time Batched 8:20 Weather Condition CLEAR
Concrete Temperature (°F) 79 Ambient Temperature (°F) 70 Mix Number 51
Mix Description W/R Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4 1/2
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
83A 7 4/21 79000 2790 3000/28 DAYS
B 28 5/12 116000 4100
C 28 5/12 107000 3780
D H
Curing Method Test Method Standard 6" x 12" I Engineer/Technician D. GODBEY
Area sq.
ASTM C 31 ] ASTM C 39,,I 28.27 in.
I
Signature: Mike Fuller, ~,.111~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality Icomposition, appearance, performance, etc.) or any other feature of similar subject ma~er provided by
persons or conditions over which we have no control. Our letters and reports are for the excJusive use of the clients to whom they are
addressed.
c:\wpwin~reports\D7429-1SS-98\ST May 1S. 1998