Mansions Phase 1-LR 980515 (3) i Rone Engineers, Inc. 1"";4 Goodnight Lane I Tel. (972) 241-45-, Rone ineers
; I
I Dallas:-For~ Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-156 Date of Observation 4/14/98 Report Date 05/15/98
To Western Rim Services
Location BUILDING #34 SLAB, NORTHEAST CORNER, 2_5' WEST, 3' SOUTH
Contractor
Supplier LATTIMORE Plant 7 I Truck 457 Ticket 7049599
I
Time Sampled 11:00 Time Batched 10:50 Weather Condition CLEAR
Concrete Temperature (°F) 84 Ambient Temperature (°F) 70 Mix Number 51
Mix Description W/R Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6.0
Concrete Cylinder Test(s)
I I Total Load Compressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
84A 7 4/21 81000 2870 3000/28 DAYS
B 28 5/12 113000 4000
C 28 5/12 110000 3890
D H
Curing Method I TestMethod I Standard 6" x12" I Engineer/TechnicianD. GODBEY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, ~,Supervisor, CMT
Remarks and/or Distribution ~v
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'.wpwin\reports\D7429-156-98\ST May 15, 1998