Mansions Phase 1-LR 980515 (5) .one Engineer~, Inc. 1 '~'~4 OooOnignt Lane 'Tel. -' RoneEnqineers
Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 4 of 4
Report No: 3137-D7429-185 Sample Date: April 28, 1998
Client: Western Rim Services Report Date: May 15, 1998
location: Building #7 Technician: K. Courtier
# Tendbn Locati6n Jacl~ Force Gaug~ Required' Elongations Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance
58 Sl01 West Side 33K 7800 7 7/8 7 1/4 -- 7 1i4 Y
59 SiO1 West Side 33K 7800 7 7i8 8 i/8 -- 8 1i8 Y
60 B79 West Side 33K 7800 6 118 6 1/4 -- 6 1!4 Y
61 S15 South Side 33K 7800 1 1 7/8 -- 1 7/8 N
62 $27 West Side 33K 7800 2 I 7/8 -- 1 7/8 Y
63 S27 West Side 33K 7800 2 1 5/8 -- 1 5/8 N
64 B27 West Side 33K 7800 2 I 7/8 -- 1 7/8 Y
Equipment ID: Ram No: 38077 Pump No: 380005 Gauge No: 38077
Equipment Calibration Date: 01/08/98
Comments: Cable technician pulled these remaining cables after his machine was fixed and recalibrated.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Sen, ices
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LI~.IrrATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, perfo.'mance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed.
c::,wpwin\reports\D7429-18598',SH May 15, 1998 a~