Mansions Phase 1-LR 980514 none Engineers, Inc. 1 '~'4 Goodnight Lane Tel. (972) 241-451 "-" RoneEnoineers
Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-150 Date of Observation 4/09/98 Report Date 05/14/98
To Western Rim Services
Location BUILDING #9, 20' NORTH, 40' WEST FROM SOUTHEAST CORNER
Contractor EDWARDS CONSTRUCTION
Supplier LATTIMORE Plant 6 I Truck 802 Ticket 5069801
Time Sampled 7:40 Time Batched 7:30 Weather Condition CLEAR
Concrete Temperature {°F) 70 Ambient Temperature (°F) 72 Mix Number 61
Mix Description WiR AIR Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
80A 7 4/16 72000 2550 3000/28 DAYS
B 28 5/07 100000 3540
C 28 5/07 103000 3640
D H
Curing Method I Test Method Standard 6" x 12" Engineer/Technician D. GODBEY
ASTM C 31 I ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, ~/~ Supervisor,
CMT
Remarks and/or Distribution'~
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition. appearance, performance, etc. J or any other feature of similar subject matter provided by
persons or conditions over wnich we have no control. Our lepers and reports are for the exclusive use of the ciients to whom they are
adaressed.
c:'.wpw~n'repor[s-.D7429-~ 50-98;ST May 14, ; 998