Loading...
Mansions Phase 1-LR 980511 (06) I~l~n~ I~r~Qin~,r~. Inc. '( ~"""~, Qoodniejh/Lane 'Fei. (972) 241-451 -'"'"" Dallas/Fo,1 Worln Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-143 I Date of Observation 4/07/98 Report Date 05/11/98 To Western Rim Services Location BUILDING 38, NORTHWEST CORNER Contractor EDWARDS CONSTRUCTION Supplier LATTIMORE Plant 7 I Truck 755 Ticket 7049294 I Time Sampled 9:50 Time Batched 9:35 Weather Condition CLEAR Concrete Temperature (°F) Ambient Temperature (°F) Mix Number 14 Mix Description 4.50 SACKS W/R Unit Weight Water Added 8 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.5 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 79A 7 4/14 76000 2690 3000/28 DAYS B 28 4/05 105000 3710 C 28 4/05 107000 3780 D H Test Method I Standard 6" x 12"I Engineer/Technician R. YARBROUGH Curing Method ASTMC31 I ASTMC39_ I Area 28.27 sq. in. I Mike Fuller,( Ir) Supervisor, CMT Signature: Remarks and/or DistributionS,/ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quaJit¥ (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:;wpwin\reports;D7429-143-98\ST Ma'/ 11, 1998