Mansions Phase 1-LR 980511 (12)R°ne l engineers' Inc' I ~'~ 4 G°°dnight Lane Te{' (9721 241-451"~ RoneEnclineers
Dallas/For1 Worm Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
GENERAL REPORT
PROJECT: Mansions By The Lake
REPORT NO: 3137-D7429-198 REPORT DATE: 05/11/98
CLIENT: Western Rim Services COLLECTION DATE: 05/07/98
REPORT OF: Cylinder Collection
On the above collection date, Demetrius Godbey, representing Rone Engineers, Inc., arrived
on site at the above referenced project to pick up concrete cylinders made on May 6, 1998
for compressive strength testing.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed.
c:..,a,p,c,-in;repo~D?.a29-19S-98'~qH Ma~. I I. i998