Loading...
Mansions Phase 1-LR 980508 (4) I~one Engineers, Inc. 1,'---34 Gooclnight Lane Tel. (972) 241-45*'~' ineers Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-126 Date of Observation 4/02/98 Report Date 05/08195 To Western Rim Services Location BUILDING //35, NORTHWEST CORNER SLAB Contractor Supplier LATTIMORE MATERIALS Plant 3 I Truck 618 Ticket 3060133 Time Sampled 8:00 Time Batched 7:30 Weather Condition PT CLOUDY Concrete Temperature (°F) 68 Ambient Temperature {°F) 60 Mix Number 14 Mix Description 4.50 SACKS W/R Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.5 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 70A 7 4/09 66000 2330 3000/28 DAYS B 28 4/30 76000 2690* C 28 4/30 80000 2830* D 56 5/28 Curing Method I TestMethod Standard 6" x12" I Engineer/TechnicianR. YARBROUGH ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution *DIDN'T REACH REQUIRED STRENGTH, WILL TEST HOLD CYLINDER AT 56 DAY BREAK Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:;wpwin~repor~s\D7429-126-98\ST May 8, 1998 ~