Loading...
Mansions Phase 1-LR 980429 (08) ,~n~ :.stn~r~. ,.~. ~ ~'"~4 OooOn',ght Lane Tel. 24~-4s, RoneEnoineers Dallas¢'Fon Womb Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-174 I Date of Observation 4/21/98 Report Date 04/29/98 To Western Rim Services Location 10' EAST AND 2' SOUTH OFF NORTHEAST CORNER OF BUILDING #7 SLAB Contractor Supplier BUTLER I Plant 1 ITruck 83 Ticket 018040 Time Sampled 10:20 Time Batched 9:16 Weather Condition CLEAR Concrete Temperature {°F) 6:20 Ambient Temperature (°F) 6:00 Mix Number 304 Mix Description Unit Weight Water Added 20 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.75 Concrete Cylinder Test(s) J IT°tal L°ad C°mpressive Specimen Age Test Date No. (Days) (lbs,) Strength (psi) Strength Required (psi) 88A 7 4/28 65000 2300 3000/28 DAYS B 28 5/19 C 28 5/19 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution CONTRACTOR CHANGED CONCRETE COMPANIES Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other rear,Ire of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:',wpwin\reports\D7429-174-98\ST April 29, 1998