Loading...
Mansions Phase 1-LR 980428 Rone Engineers, Inc. 1'--"4 Goodnight Lane ,i Tel. (972) 241-451"-" Rone ineers Dallasi'Fon Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 REPORT OF FIELD COMPACTION TESTS TESTED FOR: Western Rim Services PROJECT: Mansions By The Lake PAGE 1 OF 2. DATE: 04/28/98 OUR REPORT NO.: 3137-D7429-187 TEST DATA: STANDARD: 321 5 (~ 61 6 ADJUSTMENT DATA: MAXIMUM OPTIMUM IN PLACE IN PLACE IN PLACE SOIL ID LAB DRY MOISTURE WET DRY MOISTURE PERCENT TEST NO DEPTH NUMBER DENSITY CONTENT DENSITY DENSITY CONTENT COMPACTION COMMENT 1 6 011 111.8 13,4 125.6 111.7 12.4 99.9% 4A 2 6 011 111.8 13.4 124.5 110.0 13.2 98.4% 4A 3 6 011 111.8 13.4 127.3 111.2 14.5 99.5% 4A 4 6 011 111.8 13.4 127.3 111.2 14.5 99.5% 4A 5 6 011 111.8 13.4 121.9 107.5 13.4 96.2% 4A 6 6 011 111.8 13.4 125.2 111.5 12.3 99.7% 4A 7 6 011 111.8 13.4 125.4 109.1 14.9 97.6% 4A R R (311 111 ~ lq ,4_ *.. ?C) R 1C).R R 13 q q~. ~o/~ TEST LOCATION: GAUGE MAKE: TROXLER MODEL: 3430 SERIAL NUMBER: 24675 1 20' SOUTH & 25' WEST OFF NORTHEAST CORNER OF BUILDING #15. 5TH LIFT. 2 25' SOUTH & 20' WEST OFF NORTHEAST CORNER OF BUILDING #16. 5TH LIFT. 3 35' NORTH & 25' EAST OFF SOUTHWEST CORNER OF BUILDING #18. 5TH LIFT. 4 15' SOUTH & 25' WEST OFF NORTHEAST CORNER OF BUILDING #19, 5TH LIFT. 5 25' NORTH & 15' EAST OFF SOUTHWEST CORNER OF BUILDING #20. 5TH LIFT. 6 20' NORTH & 20' EAST OFF SOUTHWEST CORNER OF BUILDING #21. 5TH LIFT. 7 25' NORTH & 25' EAST OFF SOUTHWEST CORNER OF BUILDING #22. 5TH LIFT. 8 20' SOUTH & 10' WEST OFF NORTHEAST CORNER OF BUILDING #24. 6TH LIFT. NOTES:DENSITIES SHOWN: Lbs. per cubic foot 1, FILL MATERIAL A, TEST RESULTS COMPLY WITH SPECIFICATIONS MOISTURE CONTENT: Percent of dry weight 2. BACKFILL B. RECOMPACTION REQUIRED PERCENT COMPACTION: Based on maximum 3. BASE COURSE C. TEST IS AFTER RECOMPACTION density obtained on sample 4. SUBGRADE MATERIALS D. MOISTURE CONTENT OUT OF SPECIFICATION indicated by soil ID number. 5. STABIL'.ZED SUBGRADE 6. OTHER REMARKS: TECHNICIAN: K. Mustafa / K. Courtier VISUAL DESCRIPTION OF MATERIAL - Dark & Light Brown Clay Mix. DISTRIBUTION: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr, Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppetl (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting Mi ASTM :) 2922 & D30;7 CM~sor RONE ENGINEERS, INC. 'IMITATIONS: The =est results presented herein were ~reparea casea upon :ne sl;ec:f,c sarnpJes provl(3eo for tesllnl3. YVe assume no resl.~onslb~;ty for var=abcn in :con~pCSltion, apoearance, performance, etc.] or any o~her feature of s;rnllar si, elect '~at:er =rOvlded ~y persons or :cnditio~s ever wP. ich ','ye have no cont,ol. Cur .e',;ers ano reports are for the eXClL, sive use of :ne clients to wll, orn ~',e¥ are acdresseu. c:'.wpwin'.reports'.DTA2S-187-SS\SH May S, 1998 Rone Engineers, Inc. :. 1"'~'4 Goodnight Lane Tel. (972) 241-451'~' RoneEn, ineers Dallas,'Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 REPORT OF FIELD COMPACTION TESTS TESTED FOR: Western Rim Services PROJECT: Mansions By The Lake PAGE 2 OF 2 DATE: 04/'28/98 OUR REPORT NO.: 3137-D7429-187 TEST DATA: STANDARD: 3215 @ 616 ADJUSTMENT DATA: MAXIMUM OPTIMUM IN PLACE IN PLACE IN PLACE SOIL ID LAB DRY MOISTURE WET DRY MOISTURE PERCENT TEST NO DEPTH NUMBER DENSITY CONTENT DENSITY DENSITY CONTENT COMPACTION COMMENT 9 6 011 111.8 13.4 123.6 108.4 14.0 97.0% 4A 10 6 011 111.8 13.4 123.2 109.6 12.4 98.0% 4A 11 6 011 111.8 13.4 126.5 110.6 14.4 98.9% 4A 12 6 011 111.8 13.4 125.7 110.3 14.0 98.7% 4A 13 6 011 111.8 13.4 120.3 107.4 12.0 96.1% 4A 14 6 011 111.8 13.4 120.5 106.9 12.7 95.6% < 4A TEST LOCATION: GAUGE MAKE: TROXLER MODEL: 3430 SERIAL NUMBER: 2.4675 9 20' SOUTH & 10' WEST OFF NORTHEAST CORNER OF BUILDING #23. 6TH LIFT. 10 40' SOUTH & 30' WEST OFF NORTHEAST CORNER OF BUILDING #22. 6TH LIFT. 11 35' SOUTH & 5' WEST OFF NORTHEAST CORNER OF BUILDING #21. 6TH LIFT. 12 30' SOUTH & 15' WEST OFF NORTHEAST CORNER OF BUILDING #20. 6TH LIFT. 13 45' SOUTH & 46' WEST OFF NORTHEAST CORNER OF SAND COURT. 6TH LIFT. 14 10' NORTH & 10' EAST OFF SOUTHWEST CORNER OF DRIVING RANGE. 6TH LIFT. NOTES:DENSITIES SHOWN: Lbs. per cubic foot 1. FILL MATERIAL A. TEST RESULTS COMPLY WITH SPECiFiCATIONS MOISTURE CONTENT: Percent of dry weight 2. BACKFILL B. RECOMPACTION REQUIRED PERCENT COMPACTION: Based on maximum 3. BASE COURSE C. TEST IS AFTER RECOMPACTION drv density obtained on sample 4. SUBGRADEMATERIALS D. MOISTURE CONTENT OUT OFSPEC~FiCAT!ON indicated by soil ID number. 5. STABILIZED SUBGRADE 6. OTHER REMARKS: TECHNICIAN: K. Mustafa / K. Courtier VISUAL DESCRIPTION OF MATERIAL - Dark & Light Brown Clay Mix. DISTRIBUTION: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Dovle Damron; C. D. Construction Consulting Mike Fuller, ASTM :) 2922 & 33017 CMT Supervisor RONE ENGINEERS, INC. _!MITATICNS: mne test results presented herein were pre~ared based u~on '.he spec:ftc samp,ea ~.rcv-cle(= for test:ng. '~¥e assume no res;'.or~JIb,llt¥ for varla:.on 'compcsition, appearance, performance, etc.) cr any otr3er feature of slm.,ar s~D~ec! matter provided by ~er$o~.e or concition$ over W~lCtl we nave no con'.roi. ~r and reocrts are for the exclusive uae of the c~ients :o ~vhcm [hey are adcresaec. c:'.wpw,n'.reoorts~D7429- ! 97-gB~SH M ay 6, 1995