Loading...
Mansions Phase 1-LR 980428 (3) il Rone Engineers, Inc. 1 ~'4 Goodnight Lane Tel. (972) 241-451A RoneEn ineers i Dallas.-'Forl Worlh Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-107 Date of Observation 3/24198 Report Date 04/28/98 To Western Rim Services Location BUILDING 44, SOUTHEAST END, 15' NORTH Contractor Supplier LATTIMORE Plant 6 I Truck 804 Ticket 6068711 Time Sampled 10:16 Time Batched 10:00 Weather Condition CLEAR Concrete Temperature (°F) 65 Ambient Temperature (°F) 70 Mix Number 14 Mix Description 4.60 SACKS Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 59A 7 3/31 74000 2620 3000/28 DAYS B 28 4/21 87000 3080 C 28 4/21 87000 3080 D H Curing Method TestMethod I Standard 6" x12" I Engineer/TechnicianD. GODBEY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS; The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-107-98\ST April 28, 1998