Mansions Phase 1-LR 980427 (03) Rone Engineers, Inc. 1' t Goodnight Lane Tel. (972) 24~-451- RoneEnclineers
Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-155 Date of Observation 4/14/98 Report Date 04/?7/98
To Western Rim Services
Location BUILDING //35 FROM THE SOUTHWEST CORNER, 47' NORTH AND 2.5' EAST
Contractor
Supplier LATTIMORE Plant 6 I Truck $03 Ticket 6070027
I
Time Sampled 8:30 Time Batched 8:20 Weather Condition CLEAR
Concrete Temperature (°F) 79 Ambient Temperature (°F) 70 Mix Number 51
Mix Description W/R Unit Weight Water Added NONE
Physical Data
ACT UAL SPECIFICATIONS
SLUMP (in.) 4 1/2
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
83A 7 4/21 79000 2790 3000/28 DAYS
B 28 5/12
C 28 5/12
D H
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell /4'4'
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.l or an,/other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom the,/ are
addressed.
c:\wpwin\repor~s\D7429-155-98\ST April 27. 1998