Loading...
Mansions Phase 1-LR 980427 (04) Rone Engineers, In(;. : 1 '~"~4 Goodnight Lane Tel. (972) 241-451-z.-.. ineers Dallas/Fort Worth, Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-156 Date of Observation 4/14/98 Report Date 04./27198 To Western Rim Services Location BUILDING #34 SLAB, NORTHEAST CORNER, 2.5' WEST, 3' SOUTH Contractor Supplier LATTIMORE [Plant7 ITruck457 Ticket 7049599 Time Sampled 11:00 Time Batched 10:50 Weather Condition CLEAR Concrete Temperature (°F) 84 Ambient Temperature (°F) 70 Mix Number 51 Mix Description W/R Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 84A 7 4/21 81000 2870 3000/28 DAYS B 28 5/12 C 28 5/12 D H Curing Method I TestMethod Standard 6" x12" I Engineer/TechnicianD. GODBEY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reporl:s are for the exclusive use of the clients to whom they are addressed. c:~wpwin\reports',D7429-156-98~ST April 27, 1998