Mansions Phase 1-LR 980427 (05) Rone Engineers, Inc. 1' t Goodnight Lane Tel. (972) 241-451 RoneEn ineers
Dallas.-'Fon Wonl~ Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-095 Date of Observation 3/20/98 Report Date 04/;)7/98
To Western Rim Services
Location BUILDING #27 - NORTHWEST CORNER, 12' EAST, 3' SOUTH
Contractor EDWARDS CONSTRUCTION
Supplier LATTIMORE I Plant 7 I Truck 786 Ticket 7048400
I
I
Time Sampled 7:30 Time Batched 7:20 Weather Condition CLOUDY
Concrete Temperature (°F) 52 Ambient Temperature (OF) 43 Mix Number 14
Mix Description 4.50 SACKS W/R Unit Weight Water Added 30 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
51A 7 3/27 77000 2720 3000/28 DAYS
B 28 4/1 7 111000 3930
C 28 4/17 110000 3890
D H
Curing Method Test Method I Standard 6" x 12" I Engineer/Technician D. GODBEY
ASTM C 31 ASTM C 39I Area 28.27 sq. in.
I
Signature: Mike Fuller, Supervisor, CUT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services /"
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-O95-98\ST April 27. 1998