Mansions Phase 1-LR 980427 (08) Rone Engineers, Inc. 11 , Goodnight Lane Tel. (972) 241-451;
Dallas.'For~ Worth !i Dallas, Texas Metro (972) 263-1555
,!75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-098 I Date of Observation 3/20/98 Report Date 04/27198
I
To Western Rim Services
Location BUILDING //44 - NORTHWEST END, 25' WEST, 20' EAST
Contractor EDWARDS CONCRETE
Supplier LATTIMORE Plant 7 I Truck 757 Ticket 7048437
I
Time Sampled 12:30 Time Batched 12:20 Weather Condition CLOUDY
Concrete Temperature (°F) 62 Ambient Temperature (°F) 63 Mix Number 14
Mix Description 4.50 SACKS W/R Unit Weight Water Added 20 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
54A 7 3/27 106000 3750 3000/28 DAYS
B 28 4/17 128500 4550
C 28 4/17 129000 4560
D H
Curing Method I Test Method Standard 6" x 12" I Engineer/Technician D. GODBEY
ASTM C 31 I ASTM C 39 Area 28.27 sq. in.
I
Signature: Mike Fuller, Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality lcomposition, appearance, performance, etc.} or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin'..reports\D7429-O98-98\ST April 27, 1998