Loading...
Mansions Phase 1-LR 980427 (10) Rone Engineers, Inc. 1 "'-' ~, Gooclnigl3t Lane Tel. (972) 241-451-'~' RoneEnaineers Dallas,Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-103 I Date of Observation 3/23/98 Report Date 04/27/98 I To Western Rim Services Location BUILDING #25, THE TWO NORTH SIDE DRIVEWAYS Contractor EDWARDS CONSTRUCTION Supplier LATTIMORE I Plant 7 I Truck 611 Ticket 7048502 I I Time Sampled 11:20 Time Batched 11:10 Weather Condition CLEAR Concrete Temperature (°F) 67 Ambient Temperature (°F) 80 Mix Number 61 Mix Description W/R AIR Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 3 1/2 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 56A 7 3/30 93000 3290 3000/28 DAYS B 28 4/20 126000 4460 C 28 4/20 127500 4510 D H Curing Method Test Method Standard 6" x 12" I Engineer/Technician D. GODBEY ASTM C 31 ASTM C 39 Area 28.27 sq. in. I Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell ,~, (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality Icomposition, appearance, perlormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reporl:s are for the exclusive use of the clients to whom they are addressed. c:\wpwin'.reports\D7429-103-98\ST April 27, 1998